1771 EWS and 88 LIG tenements at Survey no.13, Bhandarli, Tal. Dist. Thane PMAY projectProject photos will appear here when available.
Project Information
RERA Certificate No.
P51700024403
Registration No.
REA51700069017
Registration Date
2021-09-08
Developer
VIVEK BARVE
Architect
Nr Pradhan
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2024-03-29
Revised Possession
1900-01-01
Extended Possession
2024-03-29
Units Sold
0
Buildings
6
Project Area
52000.00 sq.m
Total FSI
84318.57
Approved FSI
84318.57
1771 EWS and 88 LIG tenements at Survey no.13, Bhandarli, Tal. Dist. Thane PMAY project MahaRERA — P51700024403
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors16
✅Sanctioned16
🏗️Proposed Floors16
✅Sanctioned16
🏗️Proposed Floors16
✅Sanctioned16
🏗️Proposed Floors17
✅Sanctioned17
🏗️Proposed Floors16
✅Sanctioned16
🏗️Proposed Floors48
✅Sanctioned48
Apartment Configurations
1771 EWS and 88 LIG tenements at Survey no 13 Bhan
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.95
253
0
253
0%
1771 EWS and 88 LIG tenements at survey 13 Bhandar
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.95
253
0
253
0%
1771 EWS and 88 LIG tenements at survey no 13 Bhan
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.95
253
0
253
0%
1771 EWS and 88 LIG tenements at survey no13 Bhand
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
44.95
88
0
88
0%
1771 EWS and LIG tenements at survey no 13 Bhandar
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.95
253
0
253
0%
1BHK
29.95
759
0
759
0%
Construction Progress
1771 EWS and 88 LIG tenements at Survey no 13 Bhan
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
1771 EWS and 88 LIG tenements at survey 13 Bhandar
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
1771 EWS and 88 LIG tenements at survey no 13 Bhan
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
1771 EWS and 88 LIG tenements at survey no13 Bhand
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
1771 EWS and LIG tenements at survey no 13 Bhandar
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water