📞 +91 98200 30685 ✉️
RERA: A51800043517

7 STAR HORIZON

by 7 STAR DEVELOPERS Partnership
Certificate Signed P99000055766
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000055766
Registration No.
REA99000152949
Registration Date
2024-04-16
Developer
7 STAR DEVELOPERS Partnership
Architect
Chirag Mistry And Associates
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2027-12-31
Units Sold
0
Project Area
2972.50 sq.m
Total FSI
4158.86
Approved FSI
4158.86
MahaRERA QR
7 STAR HORIZON
MahaRERA — P99000055766
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
Sanctioned1
🅿️Closed Parking5
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking17
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 31.799999237060547 0 0 0
0%
1Bhk 31.950000762939453 0 0 0
0%
1Bhk 32.959999084472656 0 0 0
0%
1Bhk 33.52000045776367 0 0 0
0%
1Bhk 34.70000076293945 0 0 0
0%
1Bhk 35.709999084472656 0 0 0
0%
1Bhk 36.81999969482422 0 0 0
0%
2Bhk 42.93000030517578 0 0 0
0%
2Bhk 45.68000030517578 0 0 0
0%
Row House 89.18000030517578 0 0 0
0%

Buiding N0 -2 -Rh 1 To 5

Type Carpet (sq.ft) Total Booked Available Status
ROW HOUSE 89.18 5 0 5
0%

Building No-1 -Wing A And Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.8 7 1 6
14%
1 BHK 31.95 14 0 14
0%
1 BHK 32.96 7 0 7
0%
1 BHK 33.52 7 0 7
0%
1 BHK 34.7 2 0 2
0%
1 BHK 35.71 1 0 1
0%
1 BHK 36.82 1 0 1
0%
2 BHK 42.93 28 0 28
0%
2 BHK 45.68 2 1 1
50%

Construction Progress

BUIDING N0 -2 -RH 1 TO 5

Basement (if any)100%

Buiding N0 -2 -Rh 1 To 5

Excavation100%

BUIDING N0 -2 -RH 1 TO 5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Buiding N0 -2 -Rh 1 To 5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUIDING N0 -2 -RH 1 TO 5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Buiding N0 -2 -Rh 1 To 5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing50%

BUIDING N0 -2 -RH 1 TO 5

Plinth100%
Podiums (if any) 0%

Buiding N0 -2 -Rh 1 To 5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUIDING N0 -2 -RH 1 TO 5

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Buiding N0 -2 -Rh 1 To 5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUIDING N0 -2 -RH 1 TO 5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Buiding N0 -2 -Rh 1 To 5

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING NO-1 -WING A AND WING B

Basement (if any)100%

Building No-1 -Wing A And Wing B

Excavation100%

BUILDING NO-1 -WING A AND WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%

Building No-1 -Wing A And Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO-1 -WING A AND WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Building No-1 -Wing A And Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing73%

BUILDING NO-1 -WING A AND WING B

Plinth100%
Podiums (if any) 0%

Building No-1 -Wing A And Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING NO-1 -WING A AND WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building No-1 -Wing A And Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING NO-1 -WING A AND WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building No-1 -Wing A And Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.