AARSH RESIDENCYProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000013232
Registration No.
REA52000023567
Registration Date
2021-09-09
Developer
SHUBHAM ENTERPRISES Partnership
Architect
Vastospati Design Group
Project Bank
UCO BANK
Proposed Possession
2027-04-30
Revised Possession
1900-01-01
Extended Possession
2026-12-31
Total Units
167
Units Sold
141 (84%)
Buildings
5
Project Area
4534.00 sq.m
Total FSI
7254.00
Approved FSI
6610.00
AARSH RESIDENCY MahaRERA — P52000013232
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable8
🔢Total
Units44
🏡Residential40
🏢Non-Residential4
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable8
🔢Total
Units43
🏡Residential38
🏢Non-Residential5
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable8
🔢Total
Units43
🏡Residential34
🏢Non-Residential9
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable8
🔢Total
Units31
🏡Residential30
🏢Non-Residential1
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable5
🔢Total
Units6
🏡Residential4
🏢Non-Residential2
Apartment Configurations
BUILDING NO 1, A-WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
25.55
4
0
4
0%
1BHK
25.67
6
0
6
0%
1BHK
26.41
10
8
2
80%
1BHK
28.65
6
0
6
0%
1BHK
28.7
4
0
4
0%
1RK
17.16
6
0
6
0%
1RK
17.59
4
0
4
0%
Shop
14.64
2
0
2
0%
Shop
16.13
1
0
1
0%
Shop
16.4
1
0
1
0%
BUILDING NO 1, B-WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
25.55
4
0
4
0%
1BHK
25.67
5
5
0
100%
1BHK
26.41
10
4
6
40%
1BHK
26.67
1
1
0
100%
1BHK
28.65
4
0
4
0%
1BHK
28.7
4
4
0
100%
1RK
17.16
6
6
0
100%
1RK
17.59
4
0
4
0%
SHOP NO 1
9.63
1
1
0
100%
SHOP NO 2.3
14.64
2
2
0
100%
SHOP NO 6.7
16.13
2
1
1
50%
BUILDING NO 2, A-WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
27.65
1
1
0
100%
1BHK
27.75
1
1
0
100%
1BHK
27.76
2
2
0
100%
1BHK
28.14
1
1
0
100%
1BHK
28.15
2
2
0
100%
1BHK
28.16
2
2
0
100%
1RK
18.06
1
1
0
100%
1RK
18.07
3
2
1
67%
1RK
18.26
4
4
0
100%
1RK
18.27
1
1
0
100%
1RK
18.42
2
2
0
100%
1RK
18.61
3
3
0
100%
1RK
18.75
4
3
1
75%
1RK
18.87
3
3
0
100%
1RK
19.22
1
1
0
100%
1RK
19.54
2
2
0
100%
1RK
19.83
1
1
0
100%
Shop
6.53
1
1
0
100%
Shop
8.57
1
1
0
100%
Shop
9.92
2
2
0
100%
Shop
10.76
1
1
0
100%
Shop
10.89
1
1
0
100%
Shop
12.4
3
3
0
100%
BUILDING NO 2, B-WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
17.59
6
6
0
100%
1RK
17.83
3
2
1
67%
1RK
17.84
3
3
0
100%
1RK
18.04
3
3
0
100%
1RK
18.11
6
6
0
100%
1RK
18.19
3
3
0
100%
1RK
18.26
3
3
0
100%
1RK
18.56
3
3
0
100%
Shop
9.36
1
1
0
100%
BUILDING NO 3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
40.55
1
0
1
0%
2BHK
40.71
1
0
1
0%
2BHK T. 101.301
41.32
2
0
2
0%
SHOP NO 1. 6
6.58
1
0
1
0%
SHOP NO 2
6.93
1
0
1
0%
Construction Progress
BUILDING NO 1, A-WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
BUILDING NO 1, B-WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 2, A-WING
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 2, B-WING
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 3
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
✅Aggregate area of recreational Open Space90%
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station95%
⬜Energy managemcnt
✅Fire protection and fire safety requirements50%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting50%
✅Open Parking80%
✅Sewerage (Chamber, Lines, Septic Tank , STP)40%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water