Al Amir Apartment

by Janzeb Amirkamal Khan Individual
Certificate SignedP51900007426
Al Amir ApartmentProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900007426
Registration No.
REA51900017759
Registration Date
2022-10-21
Developer
Janzeb Amirkamal Khan Individual
Architect
Mujawar Zakir Husain Kasam
Project Bank
AXIS BANK
Proposed Possession
2028-12-31
Revised Possession
2023-07-31
Extended Possession
2024-07-30
Total Units
255
Units Sold
108 (42%)
Buildings
1
Project Area
867.52 sq.m
Total FSI
4196.87
Approved FSI
4196.87
MahaRERA QR
Al Amir Apartment
MahaRERA — P51900007426
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors27
✅Sanctioned27
🏠Habitable22
🔢Total Units248
🏡Residential231
🏢Non-Residential17

Apartment Configurations

AL AMIR APARTMENT

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL20.91367066
51%

Construction Progress

AL AMIR APARTMENT

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.89%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Plinth0%
Podiums (if any)90%
Sanitary Fittings within the flats / premises89%
Slabs of Super Structure89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
Stilt Floor0%

NA Plot Without Structure

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station89%
⬜Energy managemcnt
✅Fire protection and fire safety requirements50%
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)89%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply89%
✅Water conservation /Rain water harvesting