📞 +91 98200 30685 ✉️
RERA: A51800043517

ALTURA UMELE

by RUBY LIFESPACES Partnership
Certificate Signed P99000048381
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000048381
Registration No.
REA99000126044
Registration Date
2024-08-20
Developer
RUBY LIFESPACES Partnership
Architect
Mr. Sanjay S. Narang
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2027-11-27
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
272
Units Sold
60 (22%)
Buildings
3
Project Area
4547.47 sq.m
Total FSI
16393.23
Approved FSI
16393.23
MahaRERA QR
ALTURA UMELE
MahaRERA — P99000048381
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
🏠Habitable16
🔢Total Units63
🏡Residential62
🏢Non-Residential1
📅Completion2027-11-27
🏗️Proposed Floors17
Sanctioned17
🏠Habitable16
🔢Total Units111
🏡Residential110
🏢Non-Residential1
📅Completion2027-11-27
🏗️Proposed Floors18
Sanctioned18
🏠Habitable17
🔢Total Units98
🏡Residential98
📅Completion2027-11-27

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 27.93000030517578 0 0 0
0%
1Bhk 28.559999465942383 0 0 0
0%
1Bhk 50.0 0 0 0
0%
2Bhk 47.400001525878906 0 0 0
0%
2Bhk 47.900001525878906 0 0 0
0%
2Bhk 48.720001220703125 0 0 0
0%
2Bhk 49.27000045776367 0 0 0
0%
2Bhk 49.47999954223633 0 0 0
0%
2Bhk 49.720001220703125 0 0 0
0%
2Bhk 49.75 0 0 0
0%
2Bhk 49.779998779296875 0 0 0
0%
2Bhk 143.86000061035156 0 0 0
0%
3Bhk 110.45999908447266 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.56 16 8 8
50%
1 BHK 50.0 16 6 10
38%
2 BHK 47.9 14 2 12
14%
2 BHK 49.48 16 1 15
6%
2 BHK 110.46 1 0 1
0%
2 BHK 143.86 1 0 1
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.93 16 4 12
25%
1 BHK 28.56 48 13 35
27%
2 BHK 47.4 14 1 13
7%
2 BHK 48.72 16 3 13
19%
2 BHK 49.78 16 5 11
31%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.93 17 0 17
0%
1 BHK 28.56 33 10 23
30%
2 BHK 49.27 16 0 16
0%
2 BHK 49.72 15 1 14
7%
2 BHK 49.75 17 1 16
6%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.35%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure47%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.35%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure47%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises18%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

C Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.