ALTURA UMELE

by RUBY LIFESPACES Partnership
Certificate SignedP99000048381
ALTURA UMELEProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000048381
Registration No.
REA99000126044
Registration Date
2024-08-20
Developer
RUBY LIFESPACES Partnership
Architect
EN CON ARCHITECTURAL & STRUCTURAL WORKS
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2028-03-27
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
272
Units Sold
76 (28%)
Buildings
3
Project Area
4547.47 sq.m
Total FSI
16393.23
Approved FSI
16393.23
MahaRERA QR
ALTURA UMELE
MahaRERA — P99000048381
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable16
🔢Total Units63
🏡Residential62
🏢Non-Residential1
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable16
🔢Total Units111
🏡Residential110
🏢Non-Residential1
🏗️Proposed Floors18
✅Sanctioned18
🏠Habitable17
🔢Total Units98
🏡Residential98

Apartment Configurations

A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.561697
56%
1BHK50.016610
38%
2BHK47.914212
14%
2BHK49.4816115
6%
2BHK143.86101
0%

B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.9316412
25%
1BHK28.56481434
29%
2BHK47.414113
7%
2BHK48.7216313
19%
2BHK49.7816511
31%
3BHK110.46101
0%

C WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.9317017
0%
1BHK28.56331023
30%
2BHK49.2716016
0%
2BHK49.7215114
7%
2BHK49.7517116
6%

Construction Progress

A WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

B WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

C WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting