📞 +91 98200 30685 ✉️
RERA: A51800043517

ASHIYANA

by — Partnership
Certificate Signed P99000052079
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000052079
Registration No.
REA99000139836
Registration Date
2023-07-19
Developer
Partnership
Architect
En Con
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2026-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
118
Units Sold
0 (0%)
Buildings
1
Project Area
1114.37 sq.m
Total FSI
5962.36
Approved FSI
5962.36
MahaRERA QR
ASHIYANA
MahaRERA — P99000052079
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
🔢Total Units118
🏡Residential104
🏢Non-Residential14
🚗Open Parking202
📅Completion2026-03-31

Apartment Configurations

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 51.06 1 0 1
0%
1 BHK 53.98 1 0 1
0%
1 BHK 54.6 14 0 14
0%
1 BHK 55.6 1 0 1
0%
1 BHK 59.48 14 0 14
0%
1 BHK 59.93 17 0 17
0%
1 BHK 60.29 17 0 17
0%
1 BHK 60.31 17 0 17
0%
2 BHK 80.65 17 0 17
0%
2 BHK 81.44 1 0 1
0%
2 BHK 83.36 3 0 3
0%
2 BHK 106.68 1 0 1
0%
Shop 23.34 2 0 2
0%
Shop 26.06 2 0 2
0%
Shop 26.24 1 0 1
0%
Shop 26.34 1 0 1
0%
Shop 27.98 2 0 2
0%
Shop 29.7 1 0 1
0%
Shop 31.28 4 0 4
0%
Shop 54.24 1 0 1
0%

Construction Progress

BUILDING NO 1

Basement (if any)100%

Building No 1

Excavation100%

BUILDING NO 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING NO 1

Plinth100%
Podiums (if any) 0%

Building No 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%

Building No 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure15%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.