📞 +91 98200 30685 ✉️
RERA: A51800043517

ASMI ENCLAVE

by AMOL RAVINDRA PATIL
N/A P99000050287
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000050287
Developer
AMOL RAVINDRA PATIL
MahaRERA QR
ASMI ENCLAVE
MahaRERA — P99000050287
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking19
🅿️Closed Parking1
📅Completion2026-12-31
🚗Open Parking28
🅿️Closed Parking1
📅Completion2026-12-31

Apartment Configurations

Asmi Enclave Wing D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.33 4 0 4
0%
1 BHK 27.58 11 0 11
0%
2 BHK 34.63 3 0 3
0%

Asmi Enclave Wing E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.48 1 0 1
0%
1 BHK 27.07 1 0 1
0%
1 BHK 27.57 1 0 1
0%
1 BHK 27.58 9 0 9
0%
1 BHK 27.7 3 0 3
0%
1 BHK 27.84 4 0 4
0%
1RK 21.19 2 0 2
0%

Construction Progress

Asmi Enclave Wing D

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Asmi Enclave Wing E

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.