AVANTE

by SWARAJ MEGA STRUCTURE PRIVATE LIMITED Company
Certificate SignedP52000016411
AVANTEProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000016411
Registration No.
REA52000036943
Registration Date
2020-03-04
Developer
SWARAJ MEGA STRUCTURE PRIVATE LIMITED Company
Architect
VASTOPATI DESIGN GROUP
Project Bank
IDBI BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
2024-06-30
Total Units
232
Units Sold
182 (78%)
Buildings
4
Project Area
14170.00 sq.m
Total FSI
13798.03
Approved FSI
13798.03
MahaRERA QR
AVANTE
MahaRERA — P52000016411
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units80
🏡Residential80
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units24
🏡Residential24
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units72
🏡Residential72
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units56
🏡Residential56

Apartment Configurations

Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.3644816
75%
2 BHK57.41853
62%
2 BHK57.77844
50%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK57.3316133
81%
2 BHK57.69871
88%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.06220
100%
1 BHK38.21660
100%
1 BHK39.89871
88%
1 BHK40.2616133
81%
1 RK25.03880
100%
1 RK26.21220
100%
2 BHK57.69880
100%
2 BHK58.0216124
75%
2 BHK58.27651
83%

Building No 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.84660
100%
1 RK25.37862
75%
1 RK27.26220
100%
2 BHK57.316124
75%
2 BHK57.47871
88%
2 BHK57.5216133
81%

Construction Progress

BUILDING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%

BUILDING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises45%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor100%

BUILDING D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.58%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station40%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths60%
✅Landscaping & Tree Planting50%
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
⬜Solid Waste Management And Disposal
✅Storm Water Drains40%
✅Street Lighting50%
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting40%