📞 +91 98200 30685 ✉️
RERA: A51800043517

Aveza Phase 1

by Tata Housing Development Company Limited Company
Certificate Signed P51900007527
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900007527
Registration No.
REA51900018818
Registration Date
2021-09-09
Developer
Tata Housing Development Company Limited Company
Architect
Kapadia Associates
Project Bank
IDBI BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
2024-12-29
Units Sold
0
Buildings
3
Project Area
35121.78 sq.m
Total FSI
77060.50
Approved FSI
44822.00
MahaRERA QR
Aveza Phase 1
MahaRERA — P51900007527
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors49
Sanctioned49
📅Completion2022-12-31
🏗️Proposed Floors41
Sanctioned41
📅Completion2022-12-31
🏗️Proposed Floors48
Sanctioned48
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 80.22000122070312 0 0 0
0%
2Bhk 74.05000305175781 0 0 0
0%
2Bhk 85.41999816894531 0 0 0
0%
2Bhk S 82.19999694824219 0 0 0
0%
2Bhk S 84.22000122070312 0 0 0
0%
2Bhk S G1 82.19999694824219 0 0 0
0%
2Bhk S G2 84.22000122070312 0 0 0
0%
3Bhk 104.4000015258789 0 0 0
0%
3Bhk 106.94000244140625 0 0 0
0%
3Bhk 107.05000305175781 0 0 0
0%
3Bhk G1 104.4000015258789 0 0 0
0%
3Bhk G1 106.94000244140625 0 0 0
0%
3Bhk G1 107.05000305175781 0 0 0
0%
3Bhk G2 104.4000015258789 0 0 0
0%
3Bhk G2 106.94000244140625 0 0 0
0%
3Bhk G2 107.05000305175781 0 0 0
0%

Tower A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 74.05 82 0 82
0%
2 BHK 80.22 73 1 72
1%
3 BHK 106.94 82 0 82
0%
3 BHK G1 106.94 1 0 1
0%
3 BHK G2 106.94 1 0 1
0%

Tower B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 85.42 3 0 3
0%
3 BHK 107.05 124 0 124
0%
3 BHK G1 107.05 1 0 1
0%
3 BHK G2 107.05 1 0 1
0%

Tower C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK S 82.2 40 0 40
0%
2 BHK S 84.22 40 0 40
0%
2 BHK S G1 82.2 1 0 1
0%
2 BHK S G2 84.22 1 0 1
0%
3 BHK 104.4 140 0 140
0%
3 BHK G1 104.4 1 0 1
0%
3 BHK G2 104.4 1 0 1
0%

Construction Progress

Tower A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
Stilt Floor 100%

Tower B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor 100%

Tower C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure44%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Sky Bridge
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Swimming pool at Podium 5 level
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.