List propertyWhatsApp
Best dealsNew projectsProjects mapBuy a flatRent a flatCommercialBuilders & developersWhy usRERA searchLocalitiesTools & calculatorsNRI hubNews+ List your propertyWhatsApp us
Mumbai property advisory & dataOperating since 1995✓ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

AYAN RESIDENCY - PHASE - 1

by MAGNUM HOME MAKERS PVT. LTD. Company
Certificate SignedP99000006966
AYAN RESIDENCY - PHASE - 1Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000006966
Registration No.
REA99000017109
Registration Date
2021-09-10
Developer
MAGNUM HOME MAKERS PVT. LTD. Company
Project Bank
ICICI BANK LIMITED
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
23
Project Area
42195.51 sq.m
Total FSI
38713.86
Approved FSI
18529.22
MahaRERA QR
AYAN RESIDENCY - PHASE - 1
MahaRERA — P99000006966
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors8
✅Sanctioned8

Apartment Configurations

BUILDING 1 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.19492029
41%
1RK12.15110
100%

BUILDING 1 - STILT TO 7TH FLOOR

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1956560
100%
Shop21.44101
0%
Shop21.66101
0%
Shop24.26110
100%
Shop28.11101
0%
Shop28.75101
0%
Shop35.54101
0%
Shop40.77101
0%
Shop77.5101
0%
Shop89.97110
100%

BUILDING 10 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.19694425
64%
1RK12.15101
0%

BUILDING 10 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1956551
98%
Shop14.45101
0%
Shop18.62101
0%
Shop19.13101
0%
Shop32.0101
0%

BUILDING 11 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1969681
99%
1RK12.15101
0%

BUILDING 11 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1956560
100%
Shop15.93101
0%
Shop18.58330
100%
Shop26.9101
0%

BUILDING 2 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.19694920
71%
1RK12.15110
100%

BUILDING 2 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1956560
100%
Shop23.96101
0%
Shop104.78101
0%

BUILDING 23 -

TypeCarpet (sq.ft)TotalBookedAvailableStatus
0—000
0%

BUILDING 3 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.46972
78%
2BHK44.83770
100%
2BHK45.59752
71%
2BHK46.5972
78%
2BHK46.55743
57%
2BHK55.44220
100%

BUILDING 3 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.0770
100%
2BHK44.8314140
100%
2BHK46.05770
100%
Shop13.88101
0%
Shop16.62101
0%
Shop29.61101
0%
Shop46.31101
0%
Shop72.17101
0%
Shop100.77101
0%
Shop378.48101
0%

BUILDING 4 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.46743
57%
2BHK45.59990
100%
2BHK46.5770
100%
2BHK46.55945
44%
2BHK56.36211
50%

BUILDING 4 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.0770
100%
2BHK44.8314140
100%
2BHK46.05770
100%
Shop11.07101
0%
Shop15.23110
100%
Shop18.31101
0%
Shop25.28101
0%

BUILDING 5 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1969618
88%
1RK12.15101
0%

BUILDING 5 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1956560
100%
Shop25.26101
0%
Shop32.55202
0%

BUILDING 6 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.19523220
62%
1RK14.6618810
44%

BUILDING 6 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.1942420
100%
1RK14.6614140
100%
Shop25.55101
0%
Shop32.55202
0%

BUILDING 7 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.46972
78%
2BHK45.59734
43%
2BHK46.5963
67%
2BHK46.55743
57%
2BHK56.36220
100%

BUILDING 7 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.0770
100%
2BHK44.8314140
100%
2BHK46.05770
100%
Shop14.79101
0%
Shop15.51101
0%
Shop24.15101
0%
Shop25.3101
0%

BUILDING 8 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.46752
71%
2BHK45.59963
67%
2BHK46.5743
57%
2BHK46.55963
67%
2BHK56.36220
100%

BUILDING 8 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.0770
100%
2BHK44.8314140
100%
2BHK46.05770
100%
Shop11.32101
0%
Shop15.49101
0%
Shop18.57101
0%
Shop25.49101
0%

BUILDING 9 - 8TH TO 16TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.46770
100%
2BHK45.59972
78%
2BHK46.5770
100%
2BHK46.55963
67%
2BHK54.31211
50%

BUILDING 9 - STILT TO 7TH FLOORS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK44.0770
100%
2BHK44.8314140
100%
2BHK46.05761
86%

Construction Progress

BUILDING 1 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.54%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 1 - STILT TO 7TH FLOOR

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 10 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 10 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 11 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.54%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 11 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 2 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 2 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 23 -

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING 3 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 3 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 4 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 4 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 5 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 5 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 6 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 6 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 7 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 7 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 8 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 8 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

BUILDING 9 - 8TH TO 16TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises8%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

BUILDING 9 - STILT TO 7TH FLOORS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises99%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station4%
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now