📞 +91 98200 30685 ✉️
RERA: A51800043517

BAFNA LUXURIA

by SHRUSHTI DEVELOPERS Partnership
Certificate Signed P99000050574
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000050574
Registration No.
REA99000133977
Registration Date
2023-08-21
Developer
SHRUSHTI DEVELOPERS Partnership
Architect
Yogesh Mhatre
Project Bank
BANK OF BARODA
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
60
Units Sold
28 (47%)
Buildings
9
Project Area
4716.85 sq.m
Total FSI
10563.84
Approved FSI
8446.49
MahaRERA QR
BAFNA LUXURIA
MahaRERA — P99000050574
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
Sanctioned1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking1
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking1
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking2
📅Completion2025-12-31
🏗️Proposed Floors11
Sanctioned11
🏠Habitable10
🔢Total Units59
🏡Residential59
🚗Open Parking5
📅Completion2025-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 56.68000030517578 0 0 0
0%
2Bhk 63.68000030517578 0 0 0
0%
2Bhk 64.0999984741211 0 0 0
0%
3Bhk 88.93000030517578 0 0 0
0%
3Bhk 89.38999938964844 0 0 0
0%
Bungalow 163.13999938964844 0 0 0
0%
Bungalow 180.82000732421875 0 0 0
0%
Bungalow 180.8800048828125 0 0 0
0%
Bungalow 194.9499969482422 0 0 0
0%

Type A Bungalow No 02

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 180.82 1 0 1
0%

Type B Bungalow No 01

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 180.88 1 0 1
0%

Type B1 Bungalow No 03

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 180.88 1 0 1
0%

Type B1 Bungalow No 04

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 180.88 1 0 1
0%

Type C Bungalow No 05

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 163.14 1 1 0
100%

Type D Bungalow No 06

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 194.95 1 1 0
100%

Type D Bungalow No 07

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 194.95 1 1 0
100%

Type E Bungalow No 08

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 163.14 1 0 1
0%

Type F Bldg No 1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 56.68 19 6 13
32%
2 BHK 63.68 10 3 7
30%
2 BHK 64.1 10 6 4
60%
3 BHK 88.93 10 3 7
30%
3 BHK 89.39 10 1 9
10%

Construction Progress

Type A Bungalow no 02

Basement (if any)100%

Type A Bungalow No 02

Excavation100%

Type A Bungalow no 02

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type A Bungalow No 02

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type A Bungalow no 02

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type A Bungalow No 02

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

Type A Bungalow no 02

Plinth100%
Podiums (if any) 0%

Type A Bungalow No 02

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type A Bungalow no 02

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Type A Bungalow No 02

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type A Bungalow no 02

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type A Bungalow No 02

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type B Bungalow no 01

Basement (if any)50%

Type B Bungalow No 01

Excavation50%

Type B Bungalow no 01

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type B Bungalow No 01

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type B Bungalow no 01

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type B Bungalow No 01

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

Type B Bungalow no 01

Plinth50%
Podiums (if any) 0%

Type B Bungalow No 01

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type B Bungalow no 01

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Type B Bungalow No 01

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type B Bungalow no 01

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type B Bungalow No 01

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type B1 Bungalow no 03

Basement (if any)100%

Type B1 Bungalow No 03

Excavation100%

Type B1 Bungalow no 03

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type B1 Bungalow No 03

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type B1 Bungalow no 03

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type B1 Bungalow No 03

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%

Type B1 Bungalow no 03

Plinth100%
Podiums (if any) 0%

Type B1 Bungalow No 03

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type B1 Bungalow no 03

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Type B1 Bungalow No 03

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type B1 Bungalow no 03

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type B1 Bungalow No 03

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type B1 Bungalow no 04

Basement (if any)100%

Type B1 Bungalow No 04

Excavation100%

Type B1 Bungalow no 04

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type B1 Bungalow No 04

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type B1 Bungalow no 04

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type B1 Bungalow No 04

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%

Type B1 Bungalow no 04

Plinth100%
Podiums (if any) 0%

Type B1 Bungalow No 04

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type B1 Bungalow no 04

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Type B1 Bungalow No 04

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type B1 Bungalow no 04

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type B1 Bungalow No 04

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type C Bungalow no 05

Basement (if any)100%

Type C Bungalow No 05

Excavation100%

Type C Bungalow no 05

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type C Bungalow No 05

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type C Bungalow no 05

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

Type C Bungalow No 05

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%

Type C Bungalow no 05

Plinth100%
Podiums (if any) 0%

Type C Bungalow No 05

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type C Bungalow no 05

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Type C Bungalow No 05

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type C Bungalow no 05

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type C Bungalow No 05

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type D Bungalow no 06

Basement (if any)100%

Type D Bungalow No 06

Excavation100%

Type D Bungalow no 06

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type D Bungalow No 06

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type D Bungalow no 06

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type D Bungalow No 06

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing25%

Type D Bungalow no 06

Plinth100%
Podiums (if any) 0%

Type D Bungalow No 06

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type D Bungalow no 06

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Type D Bungalow No 06

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type D Bungalow no 06

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type D Bungalow No 06

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Type D Bungalow no 07

Basement (if any)100%

Type D Bungalow No 07

Excavation100%

Type D Bungalow no 07

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type D Bungalow No 07

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type D Bungalow no 07

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type D Bungalow No 07

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing25%

Type D Bungalow no 07

Plinth100%
Podiums (if any) 0%

Type D Bungalow No 07

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type D Bungalow no 07

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Type D Bungalow No 07

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type D Bungalow no 07

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type D Bungalow No 07

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

Type E Bungalow no 08

Basement (if any)100%

Type E Bungalow No 08

Excavation100%

Type E Bungalow no 08

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type E Bungalow No 08

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type E Bungalow no 08

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Type E Bungalow No 08

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing25%

Type E Bungalow no 08

Plinth100%
Podiums (if any) 0%

Type E Bungalow No 08

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type E Bungalow no 08

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Type E Bungalow No 08

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type E Bungalow no 08

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type E Bungalow No 08

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

Type F Bldg no 1

Basement (if any)100%

Type F Bldg No 1

Excavation100%

Type F Bldg no 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Type F Bldg No 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Type F Bldg no 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Type F Bldg No 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises25%

Type F Bldg no 1

Plinth100%
Podiums (if any) 0%

Type F Bldg No 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Type F Bldg no 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Type F Bldg No 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Type F Bldg no 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Type F Bldg No 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure90%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.