BALARAM HEIGHTS

by GANESH TUKARAM BHANE Individual
Certificate SignedP51700080852
BALARAM HEIGHTSProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700080852
Registration No.
REA51700165970
Registration Date
2025-07-21
Developer
GANESH TUKARAM BHANE Individual
Architect
De Con Consultants
Project Bank
BANK OF BARODA
Proposed Possession
2030-04-30
Total Units
154
Units Sold
9 (6%)
Buildings
4
Project Area
2800.00 sq.m
Total FSI
4832.92
Approved FSI
4832.92
MahaRERA QR
BALARAM HEIGHTS
MahaRERA — P51700080852
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units42
🏡Residential42
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units42
🏡Residential42
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units42
🏡Residential42

Apartment Configurations

BALARAM HEIGHTS WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.65707
0%
1BHK32.8414014
0%
2BHK48.77707
0%
Land Owner32.8414014
0%

BALARAM HEIGHTS WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.8414014
0%
Land Owner32.8414014
0%

BALARAM HEIGHTS WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.88101
0%
1BHK32.92101
0%
2BHK45.7101
0%
2BHK46.3101
0%
Land Owner29.49101
0%
Land Owner29.88101
0%
Land Owner33.7202
0%

BALARAM HEIGHTS WING D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.38101
0%
2BHK48.43101
0%
2BHK48.83101
0%
Land Owner29.72101
0%
Land Owner32.25202
0%

Construction Progress

BALARAM HEIGHTS WING A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BALARAM HEIGHTS WING B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BALARAM HEIGHTS WING C

Basement (if any)1%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BALARAM HEIGHTS WING D

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
⬜Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
✅Open Parking
⬜Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting