RERA: A51800043517

Bhumika Developer

by Bhumika Developers
Kept in AbeyanceP99000011671

Project Information

RERA Certificate No.
P99000011671
Registration No.
REA99000022552
Developer
Bhumika Developers
Project Bank
BASSEIN CATHOLIC CO OP BANK LTD
Proposed Possession
2022-12-31
Revised Possession
2024-06-30
Extended Possession
1900-01-01
Buildings
3
Project Area
3994.54 sq.m
Total FSI
2992.50
Approved FSI
276.42
MahaRERA QR
Bhumika Developer
MahaRERA — P99000011671
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking8
📅Completion1900-01-01
🅿️Closed Parking24
📅Completion1900-01-01
🅿️Closed Parking10
📅Completion1900-01-01

Apartment Configurations

Mukesh Empire Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.75660
100%
1 BHK36.05330
100%
1 BHK37.66330
100%
1 BHK37.69330
100%
1 BHK37.83330
100%
1 BHK37.86330
100%
1 BHK38.64330
100%
2 BHK45.55660
100%

Mukesh Empire Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.09110
100%
1 BHK35.7511110
100%
2 BHK42.3330
100%
2 BHK45.55990
100%

Mukesh Empire Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.72110
100%
1 BHK37.4550
100%
2 BHK50.81110
100%
2 BHK56.77220
100%

Construction Progress

Mukesh Empire Building No 1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing89%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Mukesh Empire Building No 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing89%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Mukesh Empire Building No 3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing89%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting70%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now