List propertyWhatsApp
Best dealsNew projectsProjects mapBuy a flatRent a flatCommercialBuilders & developersWhy usRERA searchLocalitiesTools & calculatorsNRI hubNews+ List your propertyWhatsApp us
Mumbai property advisory & dataOperating since 1995✓ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

Bitcon Elysium

by Bitcon India Infrastructure Developers Private Limited Company
Certificate SignedP51800055839
Bitcon ElysiumProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800055839
Registration No.
REA51800153225
Registration Date
2024-05-21
Developer
Bitcon India Infrastructure Developers Private Limited Company
Architect
Manish Shah
Project Bank
UNION BANK OF INDIA
Proposed Possession
2029-05-31
Total Units
241
Units Sold
31 (13%)
Buildings
3
Project Area
3566.00 sq.m
Total FSI
12981.72
Approved FSI
6795.72
MahaRERA QR
Bitcon Elysium
MahaRERA — P51800055839
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units74
🏡Residential70
🏢Non-Residential4
🏗️Proposed Floors31
✅Sanctioned31
🏠Habitable23
🔢Total Units84
🏡Residential75
🏢Non-Residential9
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units83
🏡Residential77
🏢Non-Residential6

Apartment Configurations

BITCON ELYSIUM WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK39.99707
0%
2BHK57.83101
0%
2BHK60.29707
0%
SHOP 119.17101
0%
SHOP 1A15.95101
0%
SHOP 222.18101
0%
SHOP 320.39101
0%

BITCON ELYSIUM WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK39.9320317
15%
1BHK40.7114014
0%
1BHK40.8220218
10%
2BHK59.5520317
15%
3BHK87.47101
0%
SHOP NO 1017.95101
0%
SHOP NO 119.94101
0%
SHOP NO 1214.29101
0%
SHOP NO 1315.06101
0%
SHOP NO 1412.29101
0%
SHOP NO 410.93101
0%
SHOP NO 514.69101
0%
SHOP NO 616.9101
0%
SHOP NO 714.6101
0%
SHOP NO 817.8101
0%
SHOP NO 915.13101
0%

BITCON ELYSIUM WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK59.0707
0%
2BHK59.83707
0%
3BHK75.22808
0%
SHOP NO 1520.14101
0%
SHOP NO 1622.14101
0%
SHOP NO 1718.36101
0%
SHOP NO 1815.69101
0%

Construction Progress

BITCON ELYSIUM WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BITCON ELYSIUM WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BITCON ELYSIUM WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now