CHAWRE PLUSProject photos will appear here when available.
Project Information
RERA Certificate No.
P99000076633
Registration No.
REA99000160138
Registration Date
2024-06-18
Developer
GOLDEN CONSTRUCTIONS Partnership
Architect
HIMESH GUPTA AND ASSOCIATES
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2031-04-30
Total Units
226
Units Sold
38 (17%)
Buildings
4
Project Area
2152.51 sq.m
Total FSI
7899.34
Approved FSI
6599.34
CHAWRE PLUS MahaRERA — P99000076633
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total
Units50
🏡Residential42
🏢Non-Residential8
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total
Units69
🏡Residential56
🏢Non-Residential13
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total
Units51
🏡Residential42
🏢Non-Residential9
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total
Units56
🏡Residential56
Apartment Configurations
CHAWRE PLUS, BUILDING NO 2 - A WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
41.9
7
0
7
0%
1RK
27.59
7
0
7
0%
1RK
28.42
13
0
13
0%
1RK
29.02
13
0
13
0%
Shop
11.05
1
0
1
0%
Shop
11.07
1
0
1
0%
Shop
14.05
1
0
1
0%
Shop
14.05
2
0
2
0%
Shop
15.55
1
0
1
0%
Shop
22.86
1
0
1
0%
Shop
27.15
1
0
1
0%
CHAWRE PLUS, BUILDING NO 2 - B WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.32
14
0
14
0%
1BHK
43.05
14
0
14
0%
1BHK
43.59
12
0
12
0%
1RK
27.84
7
0
7
0%
1RK
29.27
7
0
7
0%
Shop
10.94
1
0
1
0%
Shop
11.44
2
0
2
0%
Shop
11.59
1
0
1
0%
Shop
13.22
1
0
1
0%
Shop
14.49
1
0
1
0%
Shop
18.45
1
0
1
0%
Shop
19.54
1
0
1
0%
Shop
20.43
1
0
1
0%
Shop
22.77
1
0
1
0%
Shop
27.8
2
0
2
0%
Shop
29.4
1
0
1
0%
CHAWRE PLUS, BUILDING NO 2 - C WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
27.59
3
0
3
0%
1BHK
28.82
4
0
4
0%
1BHK
28.89
4
0
4
0%
1BHK
41.93
4
0
4
0%
1RK
26.86
4
0
4
0%
Shop
11.05
2
0
2
0%
Shop
14.05
3
0
3
0%
Shop
15.55
1
0
1
0%
Shop
16.8
1
0
1
0%
Shop
25.25
1
0
1
0%
Construction Progress
CHAWRE PLUS, BUILDING NO 2 - A WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises45%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%
CHAWRE PLUS, BUILDING NO 2 - B WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor100%
CHAWRE PLUS, BUILDING NO 2 - C WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure62%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
CHAWRE PLUS, BUILDING NO 2 - D WING
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water