Chitrapatjanak Dadasaheb Phalke Township - Phase 1

by Anukarati Homes Pvt Ltd Company
Certificate SignedP52000047538
Chitrapatjanak Dadasaheb Phalke Township - Phase 1Project photos will appear here when available.

Project Information

RERA Certificate No.
P52000047538
Registration No.
REA52000121185
Registration Date
2024-04-24
Developer
Anukarati Homes Pvt Ltd Company
Architect
Naam Architect
Project Bank
AXIS BANK
Proposed Possession
2026-06-30
Revised Possession
1900-01-01
Extended Possession
2025-12-31
Total Units
813
Units Sold
797 (98%)
Buildings
4
Project Area
1427.11 sq.m
Total FSI
35463.14
Approved FSI
35463.14
MahaRERA QR
Chitrapatjanak Dadasaheb Phalke Township - Phase 1
MahaRERA — P52000047538
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units266
🏡Residential266
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units140
🏡Residential128
🏢Non-Residential12
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units140
🏡Residential128
🏢Non-Residential12
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable17
🔢Total Units267
🏡Residential267

Apartment Configurations

B1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.81281253
98%
Shop12.85404
0%
Shop14.66404
0%
Shop16.84431
75%

B2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop14.66404
0%
Shop16.84404
0%

Construction Progress

A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

B1

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

B2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
✅Community Buildings90%
✅Electrical meter room, sub-station, receiving station90%
✅Energy managemcnt90%
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths90%
✅Landscaping & Tree Planting90%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
✅Street Lighting90%
✅Treatment And Disposal Of Sewage And Sullage Water100%
✅Water Supply100%
✅Water conservation /Rain water harvesting100%