Cluster A

by Shibam Associates
Certificate SignedP52000018378
Cluster AProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000018378
Developer
Shibam Associates
Architect
CHALISA & CHALISA
Project Bank
HDFC
Proposed Possession
2027-04-30
Revised Possession
1900-01-01
Extended Possession
2024-12-08
Total Units
152
Units Sold
30 (20%)
Buildings
4
Project Area
5051.00 sq.m
Total FSI
5942.55
Approved FSI
1080.87
MahaRERA QR
Cluster A
MahaRERA — P52000018378
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units38
🏡Residential38
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units38
🏡Residential38
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units38
🏡Residential38
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units38
🏡Residential38

Apartment Configurations

A1 and A2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK36.1424420
17%
1BHK37.1214311
21%

A3 and A4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK36.1424240
100%
1BHK37.1214140
100%

A5 and A6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK36.14241014
42%
1BHK37.121459
36%

A7 and A8 - Proposed

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 RK22.1638038
0%

Construction Progress

A1 and A2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

A3 and A4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
Stilt Floor0%

A5 and A6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor0%

A7 and A8 - Proposed

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting10%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)20%
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting80%