Constn Of 219 Ts And 172 Mig Ts On Cts No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai

by Maharashtra Housing And Area Development Authority
Certificate SignedP51800000040
Constn Of 219 Ts And 172 Mig Ts On Cts No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai Project photos will appear here when available.

Project Information

RERA Certificate No.
P51800000040
Registration No.
REA51800001607
Registration Date
2018-01-02
Developer
Maharashtra Housing And Area Development Authority
Architect
Nitin Patil
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2021-12-30
Revised Possession
2019-12-31
Extended Possession
2021-12-30
Units Sold
0
Buildings
3
Project Area
27545.00 sq.m
Total FSI
20230.48
Approved FSI
20230.48
MahaRERA QR
Constn Of 219 Ts And 172 Mig Ts On Cts No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai
MahaRERA — P51800000040
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors47
✅Sanctioned47
🏗️Proposed Floors16
✅Sanctioned16
🏗️Proposed Floors24
✅Sanctioned24

Apartment Configurations

Const of 219 Tr Ts and 172 MIG Ts on CTS No 128 A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
MIG44.471720172
0%

Const of 219 tr Ts and 172 MIG Ts on CTS 128 A 1 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Bldgno3Transit25.094094
0%

Constn of 219 Tr Ts and 172 MIG Ts on CTS No 128 A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Bldgno2Transit25.01250125
0%

Construction Progress

Const of 219 Tr Ts and 172 MIG Ts on CTS No 128 A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
Stilt Floor100%

Const of 219 tr Ts and 172 MIG Ts on CTS 128 A 1 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Constn of 219 Tr Ts and 172 MIG Ts on CTS No 128 A

Basement (if any)33%
Excavation70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth33%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting