CRD Gardenia Apartments 4 - Phase II

by Dr Chandrashekhar Raghunath Dound
Certificate SignedP99000019668
CRD Gardenia Apartments 4 - Phase IIProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000019668
Registration No.
REA99000050887
Developer
Dr Chandrashekhar Raghunath Dound
Project Bank
ICICI BANK LTD
Proposed Possession
2031-04-30
Revised Possession
1900-01-01
Extended Possession
2024-12-29
Total Units
52
Units Sold
0 (0%)
Buildings
3
Project Area
1868.02 sq.m
Total FSI
3474.97
MahaRERA QR
CRD Gardenia Apartments 4 - Phase II
MahaRERA — P99000019668
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
✅Sanctioned1
🏠Habitable1
🔢Total Units5
🏢Non-Residential5
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total Units47
🏡Residential47

Apartment Configurations

Podium

TypeCarpet (sq.ft)TotalBookedAvailableStatus
SHOP9.59505
0%

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK—000
0%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK44.47202
0%
1BHK44.74101
0%
1BHK47.05202
0%
1BHK Deck39.8214014
0%
1BHK Deck47.0514014
0%
2BHK61.47101
0%
2BHK Deck61.45606
0%
2BHK Deck61.47606
0%
4BHK Deck111.32101
0%

Construction Progress

Podium

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Wing A

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Wing B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space80%
✅Community Buildings95%
✅Electrical meter room, sub-station, receiving station80%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths80%
✅Landscaping & Tree Planting80%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)80%
⬜Solid Waste Management And Disposal
✅Storm Water Drains80%
✅Street Lighting80%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply80%
✅Water conservation /Rain water harvesting80%