📞 +91 98200 30685✉️
RERA: A51800043517

Dhanya Sativali Nagri Building 10

by Sandesh Lakhuji Jadhav Individual
Certificate SignedP99000010377

Project Information

RERA Certificate No.
P99000010377
Registration No.
REA99000016909
Registration Date
2021-09-09
Developer
Sandesh Lakhuji Jadhav Individual
Architect
En Con
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2628.78 sq.m
Total FSI
2628.78
Approved FSI
2315.95
MahaRERA QR
Dhanya Sativali Nagri Building 10
MahaRERA — P99000010377
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors15
Sanctioned15
🅿️Closed Parking10
📅Completion1900-01-01
🏗️Proposed Floors15
Sanctioned15
🅿️Closed Parking10
📅Completion1900-01-01

Apartment Configurations

Building No 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
LAND OWNER23.75101
0%
LAND OWNER23.77303
0%
LAND OWNER27.16303
0%
LAND OWNER29.68101
0%
LAND OWNER31.25101
0%
LAND OWNER31.7303
0%
LAND OWNER31.96303
0%
LAND OWNER32.09303
0%
LAND OWNER32.58808
0%
LAND OWNER32.63101
0%
LAND OWNER33.23101
0%
LAND OWNER33.41101
0%
LAND OWNER33.6303
0%
LAND OWNER34.08303
0%
LAND OWNER36.56101
0%
LAND OWNER37.32303
0%
LAND OWNER39.07303
0%

C F C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
122.74404
0%
2210.58303
0%
391.89101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
122.739999771118164000
0%
2210.5800018310547000
0%
391.88999938964844000
0%
Land Owner23.75000
0%
Land Owner23.770000457763672000
0%
Land Owner27.15999984741211000
0%
Land Owner29.68000030517578000
0%
Land Owner31.25000
0%
Land Owner31.700000762939453000
0%
Land Owner31.959999084472656000
0%
Land Owner32.09000015258789000
0%
Land Owner32.58000183105469000
0%
Land Owner32.630001068115234000
0%
Land Owner33.22999954223633000
0%
Land Owner33.40999984741211000
0%
Land Owner33.599998474121094000
0%
Land Owner34.08000183105469000
0%
Land Owner36.560001373291016000
0%
Land Owner37.31999969482422000
0%
Land Owner39.06999969482422000
0%

Construction Progress

Building No 10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C F C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings10%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)55%
Solid Waste Management And Disposal35%
Storm Water Drains15%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water35%
Water Conservation, Rain water Harvesting25%
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now