📞 +91 98200 30685✉️
RERA: A51800043517

Dreams Tower

by Dreams Construction Company
Kept in AbeyanceP99000014129

Project Information

RERA Certificate No.
P99000014129
Registration No.
REA99000025182
Developer
Dreams Construction Company
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2024-12-31
Buildings
3
Project Area
706.71 sq.m
Total FSI
5690.05
Approved FSI
2246.65
MahaRERA QR
Dreams Tower
MahaRERA — P99000014129
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking18
📅Completion2018-12-31
🅿️Closed Parking18
📅Completion2018-12-31
📅Completion2018-12-31

Apartment Configurations

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
R124.89110
100%
R225.7813130
100%
R326.6110
100%
R426.12431
75%
R525.96422
50%
R626.31440
100%
R726.84321
67%
R825.7770
100%
R926.87651
83%
S132.33220
100%
S229.98110
100%

D Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
R1024.93761
86%
R1125.7623194
83%
R1226.26440
100%
R1325.7440
100%
R1426.2330
100%

E Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
R124.91440
100%
R224.83110
100%
R325.7828253
89%
R425.7312
33%
R526.2303
0%

Construction Progress

C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises68%
Overall Percentage of Completion of the work done For the entire Building /Wing74%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.77%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing65%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises68%
Overall Percentage of Completion of the work done For the entire Building /Wing74%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.77%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing65%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate27%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises32%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.77%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing65%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements50%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)90%
Solid Waste Management And Disposal
Storm Water Drains20%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting30%
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now