EMERALD WOODS 2

by SHREHIT DEVELOPERS Partnership
Certificate SignedP99000051317
EMERALD WOODS 2Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000051317
Registration No.
REA99000136184
Registration Date
2023-06-08
Developer
SHREHIT DEVELOPERS Partnership
Architect
SKYLINE ARCHITECT
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2030-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
105
Units Sold
64 (61%)
Buildings
3
Project Area
7200.00 sq.m
Total FSI
9277.35
Approved FSI
9262.35
MahaRERA QR
EMERALD WOODS 2
MahaRERA — P99000051317
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units26
🏡Residential26
🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units51
🏡Residential51

Apartment Configurations

BUILDING NO 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK56.2321417
19%
3BHK72.11716
14%

BUILDING NO 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK50.1824915
38%
2BHK63.25220
100%

BUILDING NO 4 A WING AND B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK49.4626026
0%
2BHK50.1725124
4%

Construction Progress

BUILDING NO 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor90%

BUILDING NO 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING NO 4 A WING AND B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor30%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station75%
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths75%
Landscaping & Tree Planting75%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting