Empire Estate 3

by ED REALTY Partnership
Certificate Signed P99000076805
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000076805
Registration No.
REA99000157337
Registration Date
2024-07-01
Developer
ED REALTY Partnership
Architect
Umesh Kekre
Project Bank
BANK OF BARODA
Proposed Possession
2027-12-31
Total Units
30
Units Sold
1 (3%)
Project Area
14767.79 sq.m
Total FSI
7756.10
Approved FSI
7756.10
MahaRERA QR
Empire Estate 3
MahaRERA — P99000076805
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
Sanctioned1
🏠Habitable1
🔢Total Units17
🏢Non-Residential17
🚗Open Parking120
📅Completion2027-12-31
🏗️Proposed Floors1
Sanctioned1
🏠Habitable1
🔢Total Units13
🏢Non-Residential13
🚗Open Parking119
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Land Owner Unit 252.8000030517578 0 0 0
0%
Land Owners Unit 735.25 0 0 0
0%
Unit No 1 198.89999389648438 0 0 0
0%
Unit No 11 To 14 96.69999694824219 0 0 0
0%
Unit No 12 224.3000030517578 0 0 0
0%
Unit No 13 207.0 0 0 0
0%
Unit No 14 237.6999969482422 0 0 0
0%
Unit No 15 237.60000610351562 0 0 0
0%
Unit No 16 To 17 126.30000305175781 0 0 0
0%
Unit No 2 227.39999389648438 0 0 0
0%
Unit No 3 To 4 229.3000030517578 0 0 0
0%
Unit No 5 199.1999969482422 0 0 0
0%
Unit No 5 To 11 252.8000030517578 0 0 0
0%
Unit No 6 169.8000030517578 0 0 0
0%
Unit No 7 122.5999984741211 0 0 0
0%
Unit No 8 To 10 105.9000015258789 0 0 0
0%

Industrial Building No 1

Type Carpet (sq.ft) Total Booked Available Status
Land owner unit 252.8 1 0 1
0%
land owners unit 735.25 3 0 3
0%
Unit no 12 224.3 1 0 1
0%
Unit no 13 207.0 1 0 1
0%
Unit no 14 237.7 1 0 1
0%
Unit No 15 237.6 1 0 1
0%
Unit no 16 to 17 126.3 2 0 2
0%
Unit no 5 to 11 252.8 7 0 7
0%

Industrial Building No 2

Type Carpet (sq.ft) Total Booked Available Status
Unit no 1 198.9 1 0 1
0%
Unit no 11 to 14 96.7 4 0 4
0%
Unit no 2 227.4 1 0 1
0%
Unit no 3 to 4 229.3 2 0 2
0%
Unit no 5 199.2 1 0 1
0%
Unit no 6 169.8 1 0 1
0%
Unit no 7 122.6 1 0 1
0%
Unit no 8 to 10 105.9 3 0 3
0%

Construction Progress

Industrial Building No 1

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing15%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

Industrial Building No 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing15%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.