List propertyWhatsApp
Best dealsNew projectsProjects mapBuy a flatRent a flatCommercialBuilders & developersWhy usRERA searchLocalitiesTools & calculatorsNRI hubNews+ List your propertyWhatsApp us
Mumbai property advisory & dataOperating since 1995✓ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

Fatima Enclave- A & B

by Rais Aziz Qureshi
Certificate SignedP51700019003
Fatima Enclave- A & BProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700019003
Registration No.
REA51700047508
Registration Date
2024-01-17
Developer
Rais Aziz Qureshi
Architect
ANWAY VINAY PATIL
Project Bank
INDIAN BANK
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
2024-12-29
Total Units
154
Units Sold
70 (45%)
Buildings
3
Project Area
2470.61 sq.m
Total FSI
6525.57
Approved FSI
3444.14
MahaRERA QR
Fatima Enclave- A & B
MahaRERA — P51700019003
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🏠Habitable7
🔢Total Units27
🏡Residential21
🏢Non-Residential6
🏗️Proposed Floors21
Sanctioned21
🏠Habitable20
🔢Total Units126
🏡Residential112
🏢Non-Residential14
🏗️Proposed Floors1
Sanctioned1
🏠Habitable1
🔢Total Units1
🏡Residential1

Apartment Configurations

A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK LANDOWNER27.63707
0%
1BHK LANDOWNER28.55707
0%
2BHK LANDOWNER34.71707
0%
SHOP NO 1 LANDOWNER16.69101
0%
SHOP NO 2 LANDOWNER13.61101
0%
SHOP NO 3 LANDOWNER3.63101
0%
SHOP NO 4 LANDOWNER12.87101
0%
SHOP NO 5 LANDOWNER11.38101
0%
SHOP NO 6 LANDOWNER7.03101
0%

B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK MHADA36.7303
0%
1 BHK MHADA38.2505
0%
1 BHK REFUGE38.2101
0%
1BHK34.81110
100%
1BHK36.7981
89%
1BHK38.216124
75%
1BHK LANDOWNER36.7505
0%
1BHK LANDOWNER38.213013
0%
2BHK55.1540355
88%
2BHK LANDOWNER55.1514014
0%
3BHK93.08110
100%
3BHK98.14110
100%
3BHK137.26110
100%
3BHK143.05110
100%
GYM33.0101
0%
SHOP LANDOWNER12.39101
0%
SHOP LANDOWNER12.98101
0%
Shop12.39101
0%
Shop12.98110
100%
Shop15.93440
100%
Shop16.23651
83%

ROW HOUSE

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FATIMA Row House122.0101
0%

Construction Progress

A WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor85%

B WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor85%

ROW HOUSE

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
Stilt Floor85%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now