RERA: A51800043517

FLAMINGO RESIDENCY

by SHANTEE REALTY AND LIFE SPACE Partnership
Certificate Signed P99000076599
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000076599
Registration No.
REA99000156901
Registration Date
2024-06-18
Developer
SHANTEE REALTY AND LIFE SPACE Partnership
Architect
Mufaddal Merchant
Project Bank
THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession
2028-12-31
Total Units
280
Units Sold
25 (9%)
Project Area
8490.00 sq.m
Total FSI
19772.11
Approved FSI
15572.11
MahaRERA QR
FLAMINGO RESIDENCY
MahaRERA — P99000076599
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units26
🏡Residential26
🅿️Closed Parking7
📅Completion2028-12-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units26
🏡Residential26
🅿️Closed Parking7
📅Completion2028-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units30
🏡Residential30
🅿️Closed Parking4
📅Completion2028-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units30
🏡Residential30
🅿️Closed Parking4
📅Completion2028-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units56
🏡Residential56
🅿️Closed Parking24
📅Completion2028-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units56
🏡Residential56
🅿️Closed Parking22
📅Completion2028-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units56
🏡Residential56
🅿️Closed Parking26
📅Completion2028-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.15999984741211 0 0 0
0%
1Bhk 29.6200008392334 0 0 0
0%
1Bhk 29.68000030517578 0 0 0
0%
1Bhk 29.770000457763672 0 0 0
0%
1Bhk 30.110000610351562 0 0 0
0%
1Bhk 30.40999984741211 0 0 0
0%
1Bhk 31.549999237060547 0 0 0
0%
1Bhk Land Owner 26.15999984741211 0 0 0
0%
1Bhk Land Owner 29.15999984741211 0 0 0
0%
1Bhk Land Owner 29.6200008392334 0 0 0
0%
1Bhk Land Owner 29.68000030517578 0 0 0
0%
1Bhk Land Owner 29.770000457763672 0 0 0
0%
1Bhk Land Owner 30.110000610351562 0 0 0
0%
1Bhk Land Owner 30.40999984741211 0 0 0
0%
1Bhk Land Owner 31.549999237060547 0 0 0
0%
2Bhk 48.220001220703125 0 0 0
0%
2Bhk 49.72999954223633 0 0 0
0%
2Bhk Land Owner 48.220001220703125 0 0 0
0%
2Bhk Land Owner 49.72999954223633 0 0 0
0%
Ibhk Land Owner 30.110000610351562 0 0 0
0%

Flamingo Residency Bldg No 1 A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.16 10 0 10
0%
1 BHK LAND OWNER 26.16 3 0 3
0%
2 BHK 48.22 7 0 7
0%
2 BHK LAND OWNER 48.22 6 0 6
0%

Flamingo Residency Bldg No 1 B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.16 10 0 10
0%
1 BHK LAND OWNER 29.16 3 0 3
0%
2 BHK 48.22 7 0 7
0%
2 BHK LAND OWNER 48.22 6 0 6
0%

Flamingo Residency Bldg No 2 A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.16 12 0 12
0%
1 BHK LAND OWNER 29.16 3 0 3
0%
2 BHK 48.22 8 1 7
12%
2 BHK LAND OWNER 48.22 7 0 7
0%

Flamingo Residency Bldg No 2 B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.16 10 0 10
0%
1 BHK LAND OWNER 29.16 5 0 5
0%
2 BHK 48.22 9 0 9
0%
2 BHK LAND OWNER 48.22 6 0 6
0%

Flamingo Residency Bldg No 3 A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.62 9 0 9
0%
1 BHK 29.68 9 2 7
22%
1 BHK 30.11 8 0 8
0%
1 BHK LAND OWNER 29.62 5 0 5
0%
1 BHK LAND OWNER 29.68 5 0 5
0%
2 BHK 49.73 9 1 8
11%
2 BHK LAND OWNER 49.73 5 0 5
0%
I BHK LAND OWNER 30.11 6 0 6
0%

Flamingo Residency Bldg No 3 B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.68 17 0 17
0%
1 BHK 30.11 13 0 13
0%
1 BHK 30.41 5 0 5
0%
1 BHK LAND OWNER 29.68 11 0 11
0%
1 BHK LAND OWNER 30.11 8 0 8
0%
1 BHK LAND OWNER 30.41 2 0 2
0%

Flamingo Residency Bldg No 3 C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.62 4 0 4
0%
1 BHK 29.68 9 0 9
0%
1 BHK 29.77 4 0 4
0%
1 BHK 30.11 4 0 4
0%
1 BHK 31.55 5 0 5
0%
1 BHK LAND OWNER 29.62 3 0 3
0%
1 BHK LAND OWNER 29.68 5 0 5
0%
1 BHK LAND OWNER 29.77 3 0 3
0%
1 BHK LAND OWNER 30.11 3 0 3
0%
1 BHK LAND OWNER 31.55 2 0 2
0%
2 BHK 49.73 9 0 9
0%
2 BHK LAND OWNER 49.73 5 0 5
0%

Construction Progress

FLAMINGO RESIDENCY BLDG NO 1 A WING

Basement (if any)0%

Flamingo Residency Bldg No 1 A Wing

Excavation0%

FLAMINGO RESIDENCY BLDG NO 1 A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 1 A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 1 A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 1 A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 1 A WING

Plinth0%
Podiums (if any) 0%

Flamingo Residency Bldg No 1 A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 1 A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Flamingo Residency Bldg No 1 A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 1 A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 1 A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

Basement (if any)0%

Flamingo Residency Bldg No 1 B Wing

Excavation0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 1 B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 1 B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

Plinth0%
Podiums (if any) 0%

Flamingo Residency Bldg No 1 B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Flamingo Residency Bldg No 1 B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 1 B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 1 B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 2 A WING

Basement (if any)95%

Flamingo Residency Bldg No 2 A Wing

Excavation100%

FLAMINGO RESIDENCY BLDG NO 2 A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 2 A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 2 A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 2 A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 2 A WING

Plinth95%
Podiums (if any) 0%

Flamingo Residency Bldg No 2 A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 2 A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%

Flamingo Residency Bldg No 2 A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 2 A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 2 A Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 2 B WING

Basement (if any)95%

Flamingo Residency Bldg No 2 B Wing

Excavation100%

FLAMINGO RESIDENCY BLDG NO 2 B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 2 B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 2 B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 2 B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 2 B WING

Plinth95%
Podiums (if any) 0%

Flamingo Residency Bldg No 2 B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 2 B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%

Flamingo Residency Bldg No 2 B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 2 B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 2 B Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 3 A WING

Basement (if any)50%

Flamingo Residency Bldg No 3 A Wing

Excavation90%

FLAMINGO RESIDENCY BLDG NO 3 A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 3 A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 3 A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 3 A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 3 A WING

Plinth50%
Podiums (if any) 0%

Flamingo Residency Bldg No 3 A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 3 A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Flamingo Residency Bldg No 3 A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 3 A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 3 A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 3 B WING

Basement (if any)50%

Flamingo Residency Bldg No 3 B Wing

Excavation90%

FLAMINGO RESIDENCY BLDG NO 3 B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 3 B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 3 B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 3 B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 3 B WING

Plinth50%
Podiums (if any) 0%

Flamingo Residency Bldg No 3 B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 3 B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Flamingo Residency Bldg No 3 B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 3 B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 3 B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

FLAMINGO RESIDENCY BLDG NO 3 C WING

Basement (if any)50%

Flamingo Residency Bldg No 3 C Wing

Excavation90%

FLAMINGO RESIDENCY BLDG NO 3 C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Flamingo Residency Bldg No 3 C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FLAMINGO RESIDENCY BLDG NO 3 C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Flamingo Residency Bldg No 3 C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

FLAMINGO RESIDENCY BLDG NO 3 C WING

Plinth50%
Podiums (if any) 0%

Flamingo Residency Bldg No 3 C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

FLAMINGO RESIDENCY BLDG NO 3 C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Flamingo Residency Bldg No 3 C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

FLAMINGO RESIDENCY BLDG NO 3 C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Flamingo Residency Bldg No 3 C Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.