Galaxy Apartments Cdf Wings

by Housing Development And Infrastructure Ltd Company
Certificate SignedP51800010758
Galaxy Apartments Cdf WingsProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800010758
Registration No.
REA51800019590
Registration Date
2020-06-17
Developer
Housing Development And Infrastructure Ltd Company
Architect
Indrajeet S. Deshmukh
Project Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession
2021-01-31
Revised Possession
2021-01-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
3013.81 sq.m
Total FSI
18955.42
Approved FSI
18955.42
MahaRERA QR
Galaxy Apartments Cdf Wings
MahaRERA — P51800010758
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21

Apartment Configurations

WING - D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL36.7532320
100%
RESIDENTIAL52.191011010
100%
SHOPS16.15220
100%
SHOPS17.22220
100%
SHOPS19.98110
100%
SHOPS20.55330
100%
SHOPS21.61440
100%
SHOPS22.18110
100%
SHOPS31.32110
100%

WING - F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL36.4250500
100%
RESIDENTIAL55.6334340
100%
RESIDENTIAL56.4115150
100%
SHOPS11.25440
100%
SHOPS16.14110
100%
SHOPS18.6220
100%
SHOPS19.95110
100%
SHOPS20.53110
100%
SHOPS21.59110
100%
SHOPS31.99110
100%

WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL36.632320
100%
RESIDENTIAL52.2567670
100%
SHOP8.27110
100%
SHOP15.16220
100%
SHOP16.14220
100%
SHOP17.18220
100%
SHOP18.12110
100%
SHOP19.87110
100%
SHOP20.53330
100%
SHOP21.59220
100%
SHOPS7.82110
100%

Construction Progress

WING - D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%

WING - F

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
✅Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting