Gaurav Woods Ii

by Ravi Developments
Kept in AbeyanceP51800011407
Gaurav Woods IiProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800011407
Registration No.
REA51800014798
Developer
Ravi Developments
Project Bank
YES BANK
Proposed Possession
2020-12-31
Revised Possession
2023-12-30
Extended Possession
2025-12-31
Buildings
3
Project Area
6581.00 sq.m
Total FSI
30602.58
Approved FSI
20588.11
MahaRERA QR
Gaurav Woods Ii
MahaRERA — P51800011407
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion2023-06-30
🅿️Closed Parking1
📅Completion2023-06-30
🅿️Closed Parking1
📅Completion2023-06-30

Apartment Configurations

G1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK53.442384
90%
2 BHK56.2442402
95%
2 BHK59.0842402
95%
3 BHK70.6139354
90%

G2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK53.4421032
24%
2 BHK56.0142537
12%
2 BHK56.1842636
14%
3 BHK70.3239138
3%

G3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK53.4422715
64%
2 BHK56.24422913
69%
2 BHK59.0842366
86%
3 BHK70.61392811
72%

Construction Progress

G1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate22%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises63%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises47%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.64%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing71%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure71%

G2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises4%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises3%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.22%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing4%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure8%

G3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate26%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises63%
Overall Percentage of Completion of the work done For the entire Building /Wing72%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises47%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.58%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing63%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure63%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical Meter Room, Sub-Station, Receiving Station
⬜Energy management
✅Fire Protection And Fire Safety Requirements
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Conservation, Rain water Harvesting
⬜Water Supply

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now