GAYATRI APARTMENT

by SANTOSH RAMESH RAUT Individual
Certificate SignedP52000005736
GAYATRI APARTMENTProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000005736
Registration No.
REA52000014022
Registration Date
2017-08-11
Developer
SANTOSH RAMESH RAUT Individual
Architect
A & K Associates
Project Bank
BANK OF INDIA
Proposed Possession
2024-06-30
Revised Possession
2019-12-30
Extended Possession
2024-06-30
Units Sold
0
Buildings
2
Project Area
1450.00 sq.m
Total FSI
1263.20
Approved FSI
1263.20
MahaRERA QR
GAYATRI APARTMENT
MahaRERA — P52000005736
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6

Apartment Configurations

WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.21440
100%
1BHK27.21202
0%
1BHK28.31440
100%
1BHK28.56440
100%
1RK26.75101
0%
2BHK51.96431
75%
Shop12.05202
0%

WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.21101
0%
1BHK27.21440
100%
1BHK29.66440
100%
1BHK33.45440
100%
1BHK34.55101
0%
1HK18.16440
100%

Construction Progress

WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%