📞 +91 98200 30685✉️
RERA: A51800043517

GLENONE PHASE I

by GLENTECK REALTY
Kept in AbeyanceP99000026467

Project Information

RERA Certificate No.
P99000026467
Developer
GLENTECK REALTY
Architect
Pixels
Project Bank
ICICI BANK
Proposed Possession
2024-06-30
Revised Possession
1900-01-01
Extended Possession
2025-06-30
Buildings
2
Project Area
5003.54 sq.m
Total FSI
4549.36
MahaRERA QR
GLENONE PHASE I
MahaRERA — P99000026467
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking9
📅Completion2023-12-31
🅿️Closed Parking9
📅Completion2023-12-31

Apartment Configurations

Building 1 A And B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.96202
0%
1 BHK25.2814014
0%
1 BHK26.0812012
0%
1 BHK26.27404
0%
1 BHK27.49808
0%
1 BHK27.5212012
0%
1 BHK28.79606
0%
1 BHK29.08808
0%
1 BHK29.72606
0%
1 BHK31.01606
0%
1 BHK31.27202
0%
1RK15.38202
0%
1RK22.15202
0%
2 BHK39.45202
0%
2 BHK39.73606
0%
2 BHK40.63606
0%
2 BHK42.65606
0%
2 BHK43.29808
0%
Shop9.56202
0%
Shop12.42202
0%
Shop13.16202
0%
Shop13.19202
0%
Shop17.28404
0%
Shop17.84202
0%

Building 2 C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK25.28707
0%
1 BHK26.08606
0%
1 BHK26.27202
0%
1 BHK27.49404
0%
1 BHK27.52606
0%
1 BHK28.79303
0%
1 BHK29.08404
0%
1 BHK29.72303
0%
1 BHK31.01303
0%
1 BHK31.27101
0%
1RK15.38101
0%
1RK22.15101
0%
1RK24.96101
0%
2 BHK39.45101
0%
2 BHK39.73303
0%
2 BHK40.63303
0%
2 BHK42.65303
0%
2 BHK43.29404
0%
Shop9.56101
0%
Shop12.42101
0%
Shop13.16101
0%
Shop13.19101
0%
Shop17.28202
0%
Shop17.84101
0%

Construction Progress

Building 1 A And B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building 2 C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing35%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting1%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting1%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply1%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now