Golden VistaProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800078953
Registration No.
REA51800166038
Registration Date
2025-01-24
Developer
Blue Diamond Spaces Private Limited Company
Architect
SULTAN CHAMBYAL
Project Bank
ICICI BANK LIMITED
Proposed Possession
2030-04-30
Total Units
172
Units Sold
52 (30%)
Buildings
4
Project Area
1221.95 sq.m
Total FSI
29442.80
Approved FSI
11374.02
MahaRERA QR
Golden Vista
MahaRERA — P51800078953
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable13
🔢Total Units52
🏡Residential51
🏢Non-Residential1
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable13
🔢Total Units40
🏡Residential40
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable13
🔢Total Units41
🏡Residential41
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable13
🔢Total Units39
🏡Residential39

Apartment Configurations

A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK47.1925025
0%
2BHK67.1713013
0%
2BHK69.0313013
0%
Shop143.53101
0%

B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK43.6612012
0%
1BHK45.24404
0%
1BHK48.1212012
0%
1BHK50.45404
0%
3BHK101.91808
0%

C WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK43.6612012
0%
1BHK45.24505
0%
1BHK48.1212012
0%
1BHK50.45404
0%
3BHK101.91808
0%

D WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK47.1913013
0%
2BHK65.2213013
0%
3BHK87.9813013
0%

Construction Progress

A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

C WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

D WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting