📞 +91 98200 30685✉️
RERA: A51800043517

Green Park- Tulip

by Relstruct Buildcon Limited
Kept in AbeyanceP99000013781

Project Information

RERA Certificate No.
P99000013781
Registration No.
REA99000025218
Developer
Relstruct Buildcon Limited
Project Bank
BANK OF INDIA
Proposed Possession
2019-06-30
Revised Possession
1900-01-01
Extended Possession
2025-06-30
Buildings
4
Project Area
5577.50 sq.m
Total FSI
5574.79
MahaRERA QR
Green Park- Tulip
MahaRERA — P99000013781
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking100
🅿️Closed Parking1
📅Completion2019-03-31
🚗Open Parking25
🅿️Closed Parking1
📅Completion2019-03-31
🚗Open Parking25
🅿️Closed Parking1
📅Completion2019-03-31
🚗Open Parking25
🅿️Closed Parking1
📅Completion2019-03-31

Apartment Configurations

Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.66422
50%
1 BHK40.34422
50%
1 BHK40.53835
38%
1 BHK41.44862
75%
1 BHK41.46862
75%
1RK29.8422
50%
2 BHK50.25431
75%
Shop13.85101
0%
Shop14.81101
0%
Shop16.0101
0%
Shop16.76101
0%
Shop18.98101
0%
Shop19.18101
0%
Shop22.7101
0%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.66404
0%
1 BHK40.2512210
17%
1 BHK41.44817
12%
1 BHK41.46817
12%
1 BHK47.08404
0%
2 BHK50.25404
0%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.251697
56%
1 BHK41.44862
75%
1 BHK41.46853
62%
1 BHK416.19422
50%
2 BHK50.25431
75%

Building No 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.23413
25%
1 BHK40.35422
50%
1 BHK40.52853
62%
1 BHK40.95817
12%
1RK27.54835
38%
1RK29.8422
50%
2 BHK52.56440
100%
Shop11.86101
0%
Shop14.75101
0%
Shop17.69101
0%
Shop17.93101
0%
Shop20.26101
0%
Shop23.98101
0%

Construction Progress

Building No 1

Excavation80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing8%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now