📞 +91 98200 30685✉️
RERA: A51800043517

Happinest Boisar Phase V CFC

by Mahindra Lifespace Developers limited Company
Certificate SignedP99000014295

Project Information

RERA Certificate No.
P99000014295
Registration No.
REA99000026667
Registration Date
2020-06-19
Developer
Mahindra Lifespace Developers limited Company
Architect
Ms Vastu Shilpa Consultant
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2020-11-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
3015.11 sq.m
Total FSI
2209.70
Approved FSI
2209.70
MahaRERA QR
Happinest Boisar Phase V CFC
MahaRERA — P99000014295
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors2
Sanctioned2
🚗Open Parking35
📅Completion2020-05-31

Apartment Configurations

Cfc

TypeCarpet (sq.ft)TotalBookedAvailableStatus
other utilities 21306.89101
0%
other utilities 22320.55101
0%
other utilities 23121.03101
0%
other utilities 24281.23101
0%
other utilities 25378.65101
0%
shop 112.19110
100%
shop 109.36110
100%
shop 119.39110
100%
shop 129.39110
100%
shop 1314.71110
100%
shop 149.49110
100%
shop 159.49110
100%
shop 169.49110
100%
shop 179.49110
100%
shop 189.37110
100%
shop 199.34110
100%
shop 217.83110
100%
shop 39.41110
100%
shop 49.42110
100%
shop 59.42110
100%
shop 69.42110
100%
shop 79.42110
100%
shop 89.35110
100%
shop 99.39110
100%
shop no 209.37110
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Other Utilities 21306.8900146484375000
0%
Other Utilities 22320.54998779296875000
0%
Other Utilities 23121.02999877929688000
0%
Other Utilities 24281.2300109863281000
0%
Other Utilities 25378.6499938964844000
0%
Shop 112.1899995803833000
0%
Shop 109.359999656677246000
0%
Shop 119.390000343322754000
0%
Shop 129.390000343322754000
0%
Shop 1314.710000038146973000
0%
Shop 149.489999771118164000
0%
Shop 159.489999771118164000
0%
Shop 169.489999771118164000
0%
Shop 179.489999771118164000
0%
Shop 189.369999885559082000
0%
Shop 199.34000015258789000
0%
Shop 217.829999923706055000
0%
Shop 39.40999984741211000
0%
Shop 49.420000076293945000
0%
Shop 59.420000076293945000
0%
Shop 69.420000076293945000
0%
Shop 79.420000076293945000
0%
Shop 89.350000381469727000
0%
Shop 99.390000343322754000
0%
Shop No 209.369999885559082000
0%

Construction Progress

CFC

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Cfc

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting10%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now