HDIL PARADISE CITY SECTOR 2

by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Company
Certificate SignedP99000012539
HDIL PARADISE CITY SECTOR 2Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000012539
Registration No.
REA99000019587
Registration Date
2017-09-01
Developer
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Company
Architect
Ajay Wade & Assocites
Proposed Possession
2019-09-30
Revised Possession
2018-09-30
Extended Possession
2019-09-30
Units Sold
0
Buildings
20
Project Area
38878.89 sq.m
Total FSI
55733.87
Approved FSI
55733.87
MahaRERA QR
HDIL PARADISE CITY SECTOR 2
MahaRERA — P99000012539
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6

Apartment Configurations

BUILDING NO 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL79.71495
64%
RESIDENTIAL81.091284
67%

BUILDING NO 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424195
79%
RESIDENTIAL27.22871
88%
RESIDENTIAL28.46440
100%
RESIDENTIAL28.71871
88%
RESIDENTIAL29.32101
0%
RESIDENTIAL29.41633
50%
RESIDENTIAL29.8624204
83%
RESIDENTIAL30.45440
100%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07550
100%
RESIDENTIAL36.97110
100%

BUILDING NO 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424213
88%
RESIDENTIAL27.22880
100%
RESIDENTIAL28.46422
50%
RESIDENTIAL28.71871
88%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41660
100%
RESIDENTIAL29.8624240
100%
RESIDENTIAL30.45440
100%
RESIDENTIAL33.89101
0%
RESIDENTIAL34.07541
80%
RESIDENTIAL36.97110
100%

BUILDING NO 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424240
100%
RESIDENTIAL27.22880
100%
RESIDENTIAL28.46440
100%
RESIDENTIAL28.71871
88%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41660
100%
RESIDENTIAL29.8624186
75%
RESIDENTIAL30.45422
50%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07550
100%
RESIDENTIAL36.97110
100%

BUILDING NO 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL9.33110
100%
COMMERCIAL9.87110
100%
COMMERCIAL10.59330
100%
COMMERCIAL10.81110
100%
COMMERCIAL12.6110
100%
COMMERCIAL12.84211
50%
COMMERCIAL12.99110
100%
COMMERCIAL13.08330
100%
COMMERCIAL13.17330
100%
COMMERCIAL13.77110
100%
COMMERCIAL14.16110
100%
COMMERCIAL14.51110
100%
COMMERCIAL17.14330
100%
COMMERCIAL17.27330
100%
RESIDENTIAL24.3421174
81%
RESIDENTIAL25.18330
100%
RESIDENTIAL29.41330
100%
RESIDENTIAL29.8621147
67%
RESIDENTIAL30.34330
100%
RESIDENTIAL30.76853
62%
RESIDENTIAL40.91761
86%
RESIDENTIAL42.1110
100%
RESIDENTIAL45.47110
100%

BUILDING NO 14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL9.33110
100%
COMMERCIAL9.87110
100%
COMMERCIAL10.59330
100%
COMMERCIAL10.81110
100%
COMMERCIAL12.6101
0%
COMMERCIAL12.84220
100%
COMMERCIAL12.99110
100%
COMMERCIAL13.08330
100%
COMMERCIAL13.17321
67%
COMMERCIAL14.16101
0%
COMMERCIAL14.51110
100%
COMMERCIAL17.27330
100%
COMMRCIAL13.77110
100%
COMMRCIAL17.14330
100%
RESIDENTIAL24.3421174
81%
RESIDENTIAL25.18330
100%
RESIDENTIAL29.41303
0%
RESIDENTIAL29.8621165
76%
RESIDENTIAL30.34321
67%
RESIDENTIAL30.76871
88%
RESIDENTIAL40.91770
100%
RESIDENTIAL42.1110
100%
RESIDENTIAL45.47101
0%

BUILDING NO 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424222
92%
RESIDENTIAL27.22853
62%
RESIDENTIAL28.46431
75%
RESIDENTIAL28.71862
75%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41642
67%
RESIDENTIAL29.8624213
88%
RESIDENTIAL30.45431
75%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07532
60%
RESIDENTIAL36.97110
100%

BUILDING NO 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424195
79%
RESIDENTIAL27.22871
88%
RESIDENTIAL28.46431
75%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41660
100%
RESIDENTIAL29.8624159
62%
RESIDENTIAL30.45431
75%
RESIDENTIAL33.89101
0%
RESIDENTIAL34.07541
80%
RESIDENTIAL36.97110
100%
RESIDNETIAL28.71844
50%

BUILDING NO 17

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424186
75%
RESIDENTIAL27.22871
88%
RESIDENTIAL28.46431
75%
RESIDENTIAL28.71880
100%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41651
83%
RESIDENTIAL29.8624213
88%
RESIDENTIAL30.45440
100%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07532
60%
RESIDENTIAL36.97101
0%

BUILDING NO 18

TypeCarpet (sq.ft)TotalBookedAvailableStatus
REESIDENTIAL29.8624195
79%
RESIDENTIAL24.3424195
79%
RESIDENTIAL27.22862
75%
RESIDENTIAL28.46431
75%
RESIDENTIAL28.71844
50%
RESIDENTIAL29.32101
0%
RESIDENTIAL29.41624
33%
RESIDENTIAL30.45422
50%
RESIDENTIAL33.89101
0%
RESIDENTIAL34.07523
40%
RESIDENTIAL39.97110
100%

BUILDING NO 19

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424195
79%
RESIDENTIAL27.22880
100%
RESIDENTIAL28.46440
100%
RESIDENTIAL28.71871
88%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41642
67%
RESIDENTIAL29.8624213
88%
RESIDENTIAL30.45440
100%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07550
100%
RESIDENTIAL36.97110
100%

BUILDING NO 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL33.3226917
35%
RESIDENTIAL42.630237
77%

BUILDING NO 20

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL9.33110
100%
COMMERCIAL10.54110
100%
COMMERCIAL10.59321
67%
COMMERCIAL10.8101
0%
COMMERCIAL12.69110
100%
COMMERCIAL12.84211
50%
COMMERCIAL13.08330
100%
COMMERCIAL13.17321
67%
COMMERCIAL14.66110
100%
COMMERCIAL15.18101
0%
COMMERCIAL16.79101
0%
COMMERCIAL17.14321
67%
COMMERCIAL17.27321
67%
COMMERCIAL17.41101
0%
RESIDENTIAL23.13110
100%
RESIDENTIAL24.3421210
100%
RESIDENTIAL25.18330
100%
RESIDENTIAL27.22770
100%
RESIDENTIAL28.46440
100%
RESIDENTIAL28.58110
100%
RESIDENTIAL28.71880
100%
RESIDENTIAL29.41303
0%
RESIDENTIAL29.8621192
90%
RESIDENTIAL30.34330
100%
RESIDENTIAL30.45321
67%
RESIDENTIAL31.55110
100%
RESIDENTIAL34.07220
100%

BUILDING NO 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.824177
71%
RESIDENTIAL37.01220
100%
RESIDENTIAL41.8424177
71%
RESIDENTIAL46.39633
50%

BUILDING NO 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.8241311
54%
RESIDENTIAL37.01220
100%
RESIDENTIAL41.8424177
71%
RESIDENTIAL46.39651
83%

BUILDING NO 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL33.32261313
50%
RESIDENTIAL42.630219
70%

BUILDING NO 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL10.75202
0%
COMMERCIAL12.77606
0%
COMMERCIAL14.36615
17%
COMMERCIAL14.46404
0%
COMMERCIAL14.95615
17%
RESIDENTIAL30.8241014
42%
RESIDENTIAL37.01202
0%
RESIDENTIAL41.8418126
67%
RESIDENTIAL43.13660
100%

BUILDING NO 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL9.33101
0%
COMMERCIAL10.54101
0%
COMMERCIAL10.59312
33%
COMMERCIAL10.8101
0%
COMMERCIAL12.69101
0%
COMMERCIAL12.84220
100%
COMMERCIAL13.08330
100%
COMMERCIAL13.17321
67%
COMMERCIAL14.66110
100%
COMMERCIAL15.18101
0%
COMMERCIAL16.79101
0%
COMMERCIAL17.14330
100%
COMMERCIAL17.27330
100%
COMMERCIAL17.41110
100%
RESIDENTIAL23.13101
0%
RESIDENTIAL24.3421192
90%
RESIDENTIAL27.22752
71%
RESIDENTIAL28.46431
75%
RESIDENTIAL28.58110
100%
RESIDENTIAL28.71880
100%
RESIDENTIAL29.41330
100%
RESIDENTIAL29.8621183
86%
RESIDENTIAL30.34321
67%
RESIDENTIAL30.45330
100%
RESIDENTIAL31.55110
100%
RESIDENTIAL34.07220
100%
RESIDNETIAL25.18330
100%

BUILDING NO 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424186
75%
RESIDENTIAL27.22880
100%
RESIDENTIAL28.46440
100%
RESIDENTIAL28.71871
88%
RESIDENTIAL29.41651
83%
RESIDENTIAL30.45431
75%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07550
100%
RESIDNETIAL29.32110
100%
RESIDNETIAL29.8624186
75%
RESIDNETIAL36.97110
100%

BUILDING NO 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL24.3424177
71%
RESIDENTIAL27.22880
100%
RESIDENTIAL28.46431
75%
RESIDENTIAL28.71862
75%
RESIDENTIAL29.32110
100%
RESIDENTIAL29.41642
67%
RESIDENTIAL29.8624213
88%
RESIDENTIAL30.45440
100%
RESIDENTIAL33.89110
100%
RESIDENTIAL34.07541
80%
RESIDENTIAL36.97110
100%

Construction Progress

BUILDING NO 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor100%

BUILDING NO 11

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 12

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 13

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 14

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor100%

BUILDING NO 15

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor100%

BUILDING NO 17

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 18

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 19

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 20

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor100%

BUILDING NO 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%

BUILDING NO 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
Stilt Floor100%

BUILDING NO 8

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 9

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths40%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains50%
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting