HDIL PARADISE CITY SECTOR 4Project photos will appear here when available.
Project Information
RERA Certificate No.
P99000012735
Registration No.
REA99000019592
Registration Date
2017-09-07
Developer
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Company
Architect
Ajay Wade & Assocites
Proposed Possession
2019-09-30
Revised Possession
2019-09-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
25
Project Area
47560.08 sq.m
Total FSI
67184.41
Approved FSI
67184.41
HDIL PARADISE CITY SECTOR 4 MahaRERA — P99000012735
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
Apartment Configurations
BUILDING NO 1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
33.32
18
7
11
39%
RESIDENTIAL
34.62
10
4
6
40%
RESIDENTIAL
34.96
20
4
16
20%
RESIDENTIAL
40.74
10
5
5
50%
BUILDING NO 10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAL
12.77
6
0
6
0%
COMMERCIAL
14.36
6
0
6
0%
COMMERCIAL
14.46
4
0
4
0%
COMMERCIAL
14.95
6
0
6
0%
COOMERCIAL
10.75
2
0
2
0%
RESIDENTIAL
30.8
24
14
10
58%
RESIDENTIAL
37.01
2
1
1
50%
RESIDENTIAL
43.13
6
3
3
50%
RESIENTIAL
41.84
18
7
11
39%
BUILDING NO 11
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
34.62
5
4
1
80%
RESIDENTIAL
34.95
18
10
8
56%
RESIDENTIAL
34.96
10
5
5
50%
RESIDENTIAL
40.74
5
3
2
60%
RESIDENTIAL
41.05
9
6
3
67%
RESIDENTIAL
42.89
10
6
4
60%
RESIDNETIAL
33.32
9
5
4
56%
BUILDING NO 12
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
11
5
69%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
1
4
20%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
13
3
81%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 13
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
5
11
31%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
5
11
31%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
1
4
20%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
10
6
62%
RESIDENTIAL
46.56
1
1
0
100%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 14
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
8
8
50%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
1
3
25%
RESIDENTIAL
41.8
16
8
8
50%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 15
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
24
7
17
29%
RESIDENTIAL
37.01
3
0
3
0%
RESIDENTIAL
41.8
24
13
11
54%
RESIDENTIAL
46.68
5
0
5
0%
BUILDING NO 16
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
7
9
44%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
9
7
56%
RESIDENTIAL
46.56
1
0
1
0%
RESIDNETIAL
46.68
3
0
3
0%
BUILDING NO 17
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
0
4
0%
RESIDENTIAL
31.88
16
8
8
50%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
9
7
56%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
2
1
67%
RESIDNETIAL
37.01
5
0
5
0%
BUILDING NO 18
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
7
9
44%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
7
9
44%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
9
7
56%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 19
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
11
5
69%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
2
3
40%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
11
5
69%
RESIDENTIAL
46.56
1
1
0
100%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
6
10
38%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
7
9
44%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
1
4
20%
RESIDENTIAL
41.55
4
2
2
50%
RESIDENTIAL
41.8
16
8
8
50%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 20
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAL
10.75
2
0
2
0%
COMMERCIAL
12.77
6
0
6
0%
COMMERCIAL
14.36
6
0
6
0%
COMMERCIAL
14.46
4
0
4
0%
COMMERCIAL
14.95
6
0
6
0%
RESIDENTIAL
30.8
24
13
11
54%
RESIDENTIAL
37.01
2
0
2
0%
RESIDENTIAL
41.84
18
5
13
28%
RESIDENTIAL
43.13
6
4
2
67%
BUILDING NO 21
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAL
11.11
3
0
3
0%
COMMERCIAL
12.4
1
0
1
0%
COMMERCIAL
14.01
3
0
3
0%
COMMERCIAL
14.18
3
0
3
0%
COMMERCIAL
15.98
3
0
3
0%
COMMERCIAL
16.11
2
0
2
0%
COMMERCIAL
16.45
2
0
2
0%
COMMERCIAL
16.54
1
0
1
0%
COMMERCIAL
16.6
3
0
3
0%
RESIDENTIAL
31.33
21
12
9
57%
RESIDENTIAL
32.07
3
1
2
33%
RESIDENTIAL
37.01
1
0
1
0%
RESIDENTIAL
41.8
21
9
12
43%
RESIDENTIAL
43.57
3
3
0
100%
RESIDENTIAL
46.68
1
1
0
100%
BUILDING NO 22
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
13
3
81%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
14
2
88%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
1
4
20%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
8
8
50%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 23
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
33.32
9
4
5
44%
RESIDENTIAL
34.62
5
2
3
40%
RESIDENTIAL
34.95
18
8
10
44%
RESIDENTIAL
34.96
10
2
8
20%
RESIDENTIAL
40.74
5
2
3
40%
RESIDENTIAL
41.05
9
3
6
33%
RESIDENTIAL
42.89
10
4
6
40%
BUILDING NO 24
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
6
10
38%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
10
6
62%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
9
7
56%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 25
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAL
36.69
1
0
1
0%
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
7
9
44%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
2
2
50%
RESIDENTIAL
41.8
16
9
7
56%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
6
10
38%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
9
7
56%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
3
1
75%
RESIDENTIAL
41.8
16
10
6
62%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
7
9
44%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
8
8
50%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
0
5
0%
RESIDENTIAL
41.55
4
1
3
25%
RESIDENTIAL
41.8
16
10
6
62%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
1
2
33%
BUILDING NO 5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
31.68
4
1
3
25%
RESIDENTIAL
31.88
16
11
5
69%
RESIDENTIAL
36.69
1
0
1
0%
RESIDENTIAL
37.01
5
1
4
20%
RESIDENTIAL
41.55
4
1
3
25%
RESIDENTIAL
41.8
16
11
5
69%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
3
0
3
0%
BUILDING NO 6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMECIAL
14.36
6
0
6
0%
COMMERCIAL
10.75
2
0
2
0%
COMMERCIAL
12.77
6
0
6
0%
COMMERCIAL
14.46
4
0
4
0%
COMMERCIAL
14.95
6
0
6
0%
RESIDENTIAL
33.32
26
18
8
69%
RESIDENTIAL
42.6
18
10
8
56%
RESIDENTIAL
44.56
6
6
0
100%
BUILDING NO 7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
30.8
24
12
12
50%
RESIDENTIAL
37.01
2
0
2
0%
RESIDENTIAL
41.84
24
12
12
50%
RESIDENTIAL
46.39
6
2
4
33%
BUILDING NO 8
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
24
14
10
58%
RESIDENTIAL
31.68
4
2
2
50%
RESIDENTIAL
31.88
16
9
7
56%
RESIDENTIAL
36.69
1
1
0
100%
RESIDENTIAL
37.01
6
1
5
17%
RESIDENTIAL
41.55
4
2
2
50%
RESIDENTIAL
41.8
24
16
8
67%
RESIDENTIAL
46.56
1
0
1
0%
RESIDENTIAL
46.68
4
1
3
25%
BUILDING NO 9
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
31.33
16
8
8
50%
RESIDENTIAL
41.8
16
10
6
62%
RESIDENTIAL
46.68
4
0
4
0%
RESIDNETIAL
37.01
2
2
0
100%
Construction Progress
BUILDING NO 1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
Stilt Floor100%
BUILDING NO 10
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 11
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%
BUILDING NO 12
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 13
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 14
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 15
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 16
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 17
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 18
Basement (if any)30%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth30%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 19
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure33%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor100%
BUILDING NO 20
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 21
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 22
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 23
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%
BUILDING NO 24
Basement (if any)15%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth15%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 25
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 3
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 4
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 5
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor100%
BUILDING NO 7
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 8
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 9
Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths20%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains10%
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water