📞 +91 98200 30685✉️
RERA: A51800043517

HDIL PARADISE CITY SECTOR 6

by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Company
Certificate SignedP99000012642

Project Information

RERA Certificate No.
P99000012642
Registration No.
REA99000019586
Registration Date
2017-09-06
Developer
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Company
Architect
Ajay Wade & Assocites
Proposed Possession
2019-06-30
Revised Possession
2019-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
16
Project Area
34575.62 sq.m
Total FSI
47917.47
Approved FSI
47917.47
MahaRERA QR
HDIL PARADISE CITY SECTOR 6
MahaRERA — P99000012642
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking16
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking15
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking15
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking15
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking16
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking15
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking9
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking15
📅Completion1900-01-01

Apartment Configurations

Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL56.63482919
60%
RESIDENTIAL64.76808
0%

Building No 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL13.09404
0%
COMMERCIAL14.72202
0%
COMMERCIAL14.87606
0%
COMMERCIAL15.76202
0%
COMMERCIAL16.66808
0%
COMMERCIAL19.34202
0%
RESIDENTIAL39.1414113
79%
RESIDENTIAL40.5214104
71%
RESIDENTIAL41.43220
100%
RESIDENTIAL42.62211
50%
RESIDENTIAL56.611495
64%
RESIDENTIAL57.4211
50%
RESIDENTIAL64.6202
0%

Building No 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL13.09404
0%
COMMERCIAL14.72202
0%
COMMERCIAL14.87606
0%
COMMERCIAL15.76202
0%
COMMERCIAL16.66808
0%
COMMERCIAL19.34202
0%
RESIDENTIAL41.991468
43%
RESIDENTIAL44.25202
0%
RESIDENTIAL45.41220
100%
RESIDENTIAL58.6316313
19%
RESIDENTIAL60.19211
50%
RESIDNETIAL40.98431
75%
RESIDNETIAL43.161082
80%

Building No 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.55404
0%
RESIDENTIAL36.69110
100%
RESIDENTIAL40.5232257
78%
RESIDENTIAL40.6316151
94%
RESIDENTIAL41.12431
75%
RESIDENTIAL46.56110
100%
RESIDENTIAL46.59707
0%

Building No 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.55413
25%
RESIDENTIAL36.69110
100%
RESIDENTIAL40.52321913
59%
RESIDENTIAL40.6316151
94%
RESIDENTIAL46.56101
0%
RESIDENTIAL46.59707
0%
RESIDNETIAL41.12440
100%

Building No 14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.55431
75%
RESIDENTIAL36.69110
100%
RESIDENTIAL40.52321616
50%
RESIDENTIAL40.6316151
94%
RESIDENTIAL41.12413
25%
RESIDENTIAL46.56110
100%
RESIDENTIAL46.59707
0%

Building No 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL34.62523
40%
RESIDENTIAL40.74532
60%
RESIDENTIAL40.981082
80%
RESIDENTIAL40.99523
40%
RESIDENTIAL43.1313112
85%
RESIDENTIAL43.16271611
59%

Building No 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL13.09404
0%
COMMERCIAL14.72202
0%
COMMERCIAL14.87606
0%
COMMERCIAL15.76202
0%
COMMERCIAL16.66808
0%
COMMERCIAL19.34202
0%
RESIDENTIAL40.98431
75%
RESIDENTIAL41.9914113
79%
RESIDENTIAL43.161082
80%
RESIDENTIAL44.25211
50%
RESIDENTIAL45.41211
50%
RESIDENTIAL60.19211
50%
RESIDNETIAL58.6316412
25%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL39.1416151
94%
RESIDENTIAL45.44211
50%
RESIDENTIAL56.6116160
100%
RESIDENTIAL64.6413
25%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL39.1416133
81%
RESIDENTIAL45.44202
0%
RESIDENTIAL56.6116115
69%
RESIDENTIAL64.6422
50%

Building No 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL14.06606
0%
COMMERCIAL14.69202
0%
COMMERCIAL15.02606
0%
COMMERCIAL17.912012
0%
COMMERCIAL18.54404
0%
RESIDENTIAL56.63422616
62%
RESIDENTIAL58.98642
67%
RESIDENTIAL64.76202
0%

Building No 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL13.09404
0%
COMMERCIAL14.87202
0%
COMMERCIAL15.76202
0%
COMMERCIAL16.66606
0%
COMMERCIAL19.34202
0%
RESIDENTIAL39.1414104
71%
RESIDENTIAL41.43220
100%
RESIDENTIAL56.611459
36%
RESIDENTIAL57.4220
100%
RESIDENTIAL64.6202
0%

Building No 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL36.69101
0%
RESIDENTIAL40.5232239
72%
RESIDENTIAL40.6316160
100%
RESIDENTIAL41.12440
100%
RESIDENTIAL46.56101
0%
RESIDENTIAL46.59725
29%
RESIDNETIAL30.55422
50%

Building No 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL34.62550
100%
RESIDENTIAL40.74541
80%
RESIDENTIAL40.981055
50%
RESIDENTIAL40.99514
20%
RESIDENTIAL43.1627198
70%
RESIDNETIAL43.1313103
77%

Building No 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.55440
100%
RESIDENTIAL36.69110
100%
RESIDENTIAL40.5216133
81%
RESIDENTIAL40.6316133
81%
RESIDENTIAL46.56110
100%
RESIDENTIAL46.59505
0%
RESIDNETIAL41.12431
75%

Building No 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL30.55440
100%
RESIDENTIAL36.69110
100%
RESIDENTIAL40.52322210
69%
RESIDENTIAL40.6316151
94%
RESIDENTIAL41.12440
100%
RESIDENTIAL46.59725
29%
RESIDNETIAL46.56101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Commercial13.09000015258789000
0%
Commercial14.0600004196167000
0%
Commercial14.6899995803833000
0%
Commercial14.720000267028809000
0%
Commercial14.869999885559082000
0%
Commercial15.020000457763672000
0%
Commercial15.760000228881836000
0%
Commercial16.65999984741211000
0%
Commercial17.899999618530273000
0%
Commercial18.540000915527344000
0%
Commercial19.34000015258789000
0%
Residential30.549999237060547000
0%
Residential34.619998931884766000
0%
Residential36.689998626708984000
0%
Residential39.13999938964844000
0%
Residential40.52000045776367000
0%
Residential40.630001068115234000
0%
Residential40.7400016784668000
0%
Residential40.97999954223633000
0%
Residential40.9900016784668000
0%
Residential41.119998931884766000
0%
Residential41.43000030517578000
0%
Residential41.9900016784668000
0%
Residential42.619998931884766000
0%
Residential43.130001068115234000
0%
Residential43.15999984741211000
0%
Residential44.25000
0%
Residential45.40999984741211000
0%
Residential45.439998626708984000
0%
Residential46.560001373291016000
0%
Residential46.59000015258789000
0%
Residential56.61000061035156000
0%
Residential56.630001068115234000
0%
Residential57.400001525878906000
0%
Residential58.630001068115234000
0%
Residential58.97999954223633000
0%
Residential60.189998626708984000
0%
Residential64.5999984741211000
0%
Residential64.76000213623047000
0%
Residnetial30.549999237060547000
0%
Residnetial40.97999954223633000
0%
Residnetial41.119998931884766000
0%
Residnetial43.130001068115234000
0%
Residnetial43.15999984741211000
0%
Residnetial46.560001373291016000
0%
Residnetial58.630001068115234000
0%

Construction Progress

BUILDING NO 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor 100%

BUILDING NO 10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor 100%

BUILDING NO 12

Basement (if any)15%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth15%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 13

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 14

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 15

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor 100%

BUILDING NO 16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor 100%

BUILDING NO 2

Basement (if any)15%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth15%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 3

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
Stilt Floor 100%

BUILDING NO 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor 100%

BUILDING NO 6

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth80%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure74%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%
Stilt Floor 100%

BUILDING NO 8

Basement (if any)50%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth50%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

BUILDING NO 9

Basement (if any)0%
Excavation90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains35%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now