Hiraco Eminence Phase 1

by KASHIMIRA CERAMIC PRODUCTS LLP Others
Certificate SignedP51800008105
Hiraco Eminence Phase 1Project photos will appear here when available.

Project Information

RERA Certificate No.
P51800008105
Registration No.
REA51800013326
Registration Date
2020-06-14
Developer
KASHIMIRA CERAMIC PRODUCTS LLP Others
Architect
Ar.Dilipkumar Mevada
Project Bank
AXIS BANK
Proposed Possession
2020-09-30
Revised Possession
2020-09-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
14602.50 sq.m
Total FSI
20553.82
Approved FSI
11165.06
MahaRERA QR
Hiraco Eminence Phase 1
MahaRERA — P51800008105
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21
🏗️Proposed Floors21
✅Sanctioned21

Apartment Configurations

A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL3361.6686860
100%

B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL3750.8868680
100%

C WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL4237.3873730
100%

D WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL3750.8868680
100%

E WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL3366.786860
100%

Construction Progress

A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor80%

B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor80%

C WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor80%

D WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor80%

E WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor80%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting