Project Information

RERA Certificate No.
P52000000479
Registration No.
REA52000004507
Registration Date
2020-06-11
Developer
B QUBES Partnership
Architect
Trupti Panchal
Project Bank
HDFC BANK
Proposed Possession
2029-04-30
Revised Possession
2020-10-30
Extended Possession
2025-04-30
Total Units
150
Units Sold
143 (95%)
Buildings
4
Project Area
15054.00 sq.m
Total FSI
5588.65
Approved FSI
5588.65
MahaRERA QR
HOLIDAY MAIYAAN KARJAT PHASE II
MahaRERA — P52000000479
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable3
🔢Total Units48
🏡Residential48
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable3
🔢Total Units48
🏡Residential48
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable3
🔢Total Units24
🏡Residential24
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable3
🔢Total Units30
🏡Residential30

Apartment Configurations

A1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK24.5448480
100%

C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK24.5248939
19%

D3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK55.124240
100%

E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK55.1301911
63%

Construction Progress

A1

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

D3

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

E

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space70%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station75%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting
✅Open Parking70%
✅Sewerage (Chamber, Lines, Septic Tank , STP)92%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
✅Street Lighting80%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
⬜Water conservation /Rain water harvesting