List propertyWhatsApp
Best dealsNew projectsProjects mapBuy a flatRent a flatCommercialBuilders & developersWhy usRERA searchLocalitiesTools & calculatorsNRI hubNews+ List your propertyWhatsApp us
Mumbai property advisory & dataOperating since 1995✓ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

IBRAHIM RESIDENCY

by Y H ASSOICATES
Certificate SignedP51900007987
IBRAHIM RESIDENCYProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900007987
Registration No.
REA51900016339
Developer
Y H ASSOICATES
Architect
Abid Rizvi
Project Bank
UNION BANK OF INDIA
Proposed Possession
2024-07-31
Revised Possession
2024-07-31
Extended Possession
1900-01-01
Total Units
99
Units Sold
38 (38%)
Buildings
3
Project Area
765.89 sq.m
Total FSI
5300.00
Approved FSI
1990.60
MahaRERA QR
IBRAHIM RESIDENCY
MahaRERA — P51900007987
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
✅Sanctioned25
🏠Habitable15
🔢Total Units43
🏡Residential43
🏗️Proposed Floors25
✅Sanctioned25
🏠Habitable17
🔢Total Units56
🏡Residential43
🏢Non-Residential13
🏗️Proposed Floors23
✅Sanctioned23

Apartment Configurations

IBRAHIM RESIDENCY A-WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.231082
80%
1 BHK39.24101
0%
1 BHK39.2716160
100%
1 BHK51.48101
0%
1 BHK56.01101
0%
1BHK39.96707
0%
2 BHK80.12101
0%
2BHK67.53101
0%
SHOP23.26101
0%
SHOP45.44101
0%
SHOP69.51101
0%
SHOP74.25101
0%

IBRAHIM RESIDENCY B- WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.04110
100%
1 BHK39.231019
10%
1 BHK39.2716160
100%
1 BHK51.48101
0%
1 BHK56.01101
0%
1BHK39.96909
0%
3 BHK120.87101
0%
SHOP14.39101
0%
SHOP37.27101
0%
SHOP44.97101
0%

IBRAHIM RESIDENCY C- WING PROPOSED

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.2728028
0%
1 BHK53.0202
0%
2 BHK80.0101
0%

Construction Progress

IBRAHIM RESIDENCY A-WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

IBRAHIM RESIDENCY B- WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

IBRAHIM RESIDENCY C- WING PROPOSED

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station80%
⬜Energy managemcnt
✅Fire protection and fire safety requirements80%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting80%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)80%
✅Solid Waste Management And Disposal80%
✅Storm Water Drains80%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply50%
✅Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now