IMPERIAL ICON

by SAI IMPERIAL DEVELOPERS Partnership
Certificate Signed P99000055809
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000055809
Registration No.
REA99000155363
Registration Date
2024-04-22
Developer
SAI IMPERIAL DEVELOPERS Partnership
Architect
One Source
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2026-11-30
Units Sold
0
Project Area
498.00 sq.m
Total FSI
2441.25
Approved FSI
1441.25
MahaRERA QR
IMPERIAL ICON
MahaRERA — P99000055809
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🚗Open Parking33
🅿️Closed Parking1
📅Completion2026-11-30

Apartment Configurations

Imperial Icon

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.61 4 0 4
0%
1 BHK 40.89 5 0 5
0%
1 BHK 45.04 1 0 1
0%
2 BHK 51.87 11 0 11
0%
2 BHK 55.0 1 0 1
0%
Shop 10.43 1 0 1
0%
Shop 14.45 1 0 1
0%
Shop 14.79 2 0 2
0%
Shop 15.95 1 0 1
0%
Shop 16.06 1 0 1
0%
Shop 16.57 1 0 1
0%
Shop 20.71 1 0 1
0%
Shop 21.31 1 0 1
0%

Construction Progress

IMPERIAL ICON

Basement (if any)100%

Imperial Icon

Excavation100%

IMPERIAL ICON

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Imperial Icon

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

IMPERIAL ICON

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

Imperial Icon

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

IMPERIAL ICON

Plinth100%
Podiums (if any) 0%

Imperial Icon

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

IMPERIAL ICON

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%

Imperial Icon

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

IMPERIAL ICON

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Imperial Icon

Stilt Floor20%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.