IMPERIAL III

by S M HITECH DEVELOPERS Partnership
Certificate SignedP52000078932
IMPERIAL IIIProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000078932
Registration No.
REA52000165125
Registration Date
2025-01-21
Developer
S M HITECH DEVELOPERS Partnership
Architect
Anarch Architect & Planner
Project Bank
AXIS BANK
Proposed Possession
2029-04-30
Total Units
281
Units Sold
146 (52%)
Buildings
4
Project Area
6945.00 sq.m
Total FSI
17694.65
Approved FSI
17694.65
MahaRERA QR
IMPERIAL III
MahaRERA — P52000078932
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
✅Sanctioned13
🏠Habitable11
🔢Total Units65
🏡Residential65
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable15
🔢Total Units110
🏡Residential110
🏗️Proposed Floors15
✅Sanctioned15
🏠Habitable13
🔢Total Units102
🏡Residential102
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total Units4
🏢Non-Residential4

Apartment Configurations

BUILDING NO 01 LILLY-TOWER 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.9411011
0%
1BHK35.110010
0%
2BHK56.3344044
0%

BUILDING NO 02 ASTER-A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.1340040
0%
2BHK45.2314014
0%
2BHK53.0228028
0%
2BHK56.3328028
0%

BUILDING NO 02 BLUEBELL - B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.0827027
0%
1BHK35.1310010
0%
2BHK45.2313013
0%
2BHK49.9826026
0%
2BHK53.0226026
0%

COMMERCIAL BUILDING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop70.85101
0%
Shop91.34202
0%
Shop94.25101
0%

Construction Progress

BUILDING NO 01 LILLY-TOWER 1

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 02 ASTER-A WING

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 02 BLUEBELL - B WING

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

COMMERCIAL BUILDING

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting