Imperial Paradise Building No.10

by Aditi Builders &Amp; Developers
Kept in Abeyance P99000054036
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000054036
Registration No.
REA99000142294
Developer
Aditi Builders &Amp; Developers
Architect
Ajay Wade &Amp; Associates
Project Bank
ICICI BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
2932.77 sq.m
Total FSI
2932.77
MahaRERA QR
Imperial Paradise Building No.10
MahaRERA — P99000054036
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking10
📅Completion2025-12-31
🚗Open Parking10
📅Completion2025-12-31
🚗Open Parking10
📅Completion2025-12-31

Apartment Configurations

Imperial Paradise Building No 10 Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.82 7 0 7
0%
1 BHK 37.39 1 0 1
0%
1RK 21.7 1 0 1
0%
2 BHK 53.53 1 0 1
0%
2 BHK 54.3 7 0 7
0%
2 BHK 56.61 1 0 1
0%
Shop 13.39 1 0 1
0%
Shop 13.71 1 0 1
0%
Shop 13.79 1 0 1
0%
Shop 17.5 4 0 4
0%

Imperial Paradise Building No 10 Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.95 1 0 1
0%
1 BHK 33.44 14 0 14
0%
1 BHK 35.01 2 0 2
0%
1RK 20.19 1 0 1
0%
Shop 10.7 2 0 2
0%
Shop 13.65 4 0 4
0%

Imperial Paradise Building No 10 Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.82 7 0 7
0%
1 BHK 37.39 1 0 1
0%
1RK 21.7 1 0 1
0%
2 BHK 53.53 1 0 1
0%
2 BHK 54.3 7 0 7
0%
2 BHK 56.61 1 0 1
0%
Shop 13.39 1 0 1
0%
Shop 13.71 1 0 1
0%
Shop 13.79 1 0 1
0%
Shop 17.5 4 0 4
0%

Construction Progress

Imperial Paradise Building No 10 Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Imperial Paradise Building No 10 Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Imperial Paradise Building No 10 Wing C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.