📞 +91 98200 30685✉️
RERA: A51800043517

INDRAPRASTH GOVIND

by SAI INFRA Partnership
Certificate SignedP99000046271

Project Information

RERA Certificate No.
P99000046271
Registration No.
REA99000112667
Registration Date
2022-06-20
Developer
SAI INFRA Partnership
Architect
Siddhivinayak Associates
Project Bank
AXIS BANK
Proposed Possession
2028-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
162
Units Sold
16 (10%)
Buildings
15
Project Area
4030.00 sq.m
Total FSI
13587.00
Approved FSI
9087.00
MahaRERA QR
INDRAPRASTH GOVIND
MahaRERA — P99000046271
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units55
🏡Residential39
🏢Non-Residential16
🅿️Closed Parking1
📅Completion2028-12-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units40
🏡Residential26
🏢Non-Residential14
🅿️Closed Parking1
📅Completion2028-12-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units55
🏡Residential39
🏢Non-Residential16
🅿️Closed Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors5
Sanctioned5
🏠Habitable3
🔢Total Units1
🏡Residential1
⬇️Basements1
🚗Open Parking1
🅿️Closed Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors5
Sanctioned5
🏠Habitable3
🔢Total Units1
🏡Residential1
⬇️Basements1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable3
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2028-12-31

Apartment Configurations

Building No-1 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK44.232032
0%
2 BHK53.89707
0%
Shop11.55202
0%
Shop13.42202
0%
Shop13.84202
0%
Shop15.25101
0%
Shop15.26303
0%
Shop18.04606
0%

Building No-1 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK44.213013
0%
2 BHK66.2413013
0%
Shop13.42202
0%
Shop15.26202
0%
Shop16.92404
0%
Shop18.04606
0%

Building No-1 Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK44.2752
71%
2 BHK45.0713013
0%
2 BHK45.2606
0%
2 BHK52.63707
0%
2 BHK57.78606
0%
Shop12.34202
0%
Shop13.07202
0%
Shop14.65202
0%
Shop15.53211
50%
Shop18.31505
0%
Shop26.38202
0%

Row House 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK155.59101
0%

Row House 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87110
100%

Row House 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87101
0%

Row House 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK81.87110
100%

Construction Progress

Building No-1 Wing A

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Building No-1 Wing B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Building No-1 Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor 100%

Row House 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 12

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Row House 9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now