Excavation100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Slabs of Super Structure98%
Stilt Floor 98%
Sanitary Fittings within the flats / premises97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Stilt Floor 90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%