📞 +91 98200 30685 ✉️
RERA: A51800043517

JUDITH ESPANA

by JUDITH REALTORS Partnership
Certificate Signed P99000053295
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000053295
Registration No.
REA99000141346
Registration Date
2023-10-23
Developer
JUDITH REALTORS Partnership
Architect
Ajay Wade And Associates
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
5140.32 sq.m
Total FSI
7563.34
Approved FSI
7563.34
MahaRERA QR
JUDITH ESPANA
MahaRERA — P99000053295
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors15
Sanctioned15
⬇️Basements1
🚗Open Parking60
🅿️Closed Parking1
📅Completion2026-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk Land Owner 3 44.02000045776367 0 0 0
0%
1Bhk 39.9900016784668 0 0 0
0%
1Bhk 44.02000045776367 0 0 0
0%
1Bhk Land Owner 2 40.849998474121094 0 0 0
0%
1Bhk Land Owner 3 42.86000061035156 0 0 0
0%
1Bhk Land Owners 39.9900016784668 0 0 0
0%
2Bhk 59.47999954223633 0 0 0
0%
2Bhk 60.13999938964844 0 0 0
0%
2Bhk 62.380001068115234 0 0 0
0%
2Bhk 62.47999954223633 0 0 0
0%
2Bhk 68.95999908447266 0 0 0
0%
2Bhk 69.80000305175781 0 0 0
0%
2Bhk Land Owner 59.47999954223633 0 0 0
0%
2Bhk Land Owner 2 60.13999938964844 0 0 0
0%
2Bhk Land Owner 3 62.380001068115234 0 0 0
0%
2Bhk Land Owner 4 62.47999954223633 0 0 0
0%
2Bhk Land Owner 5 65.62000274658203 0 0 0
0%
2Bhk Land Owner 6 65.72000122070312 0 0 0
0%
Premium Flat 95.5 0 0 0
0%
Premium Flat 3 138.7899932861328 0 0 0
0%
Premium Flat2 128.22000122070312 0 0 0
0%

Andrew Residency, Building No 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.99 37 0 37
0%
1 BHK 44.02 1 0 1
0%
1 BHK LAND OWNER 2 40.85 1 0 1
0%
1 BHK LAND OWNER 3 42.86 1 0 1
0%
1 BHK LAND OWNER 3 44.02 1 0 1
0%
1 BHK LAND OWNERS 39.99 25 0 25
0%
2 BHK 59.48 4 0 4
0%
2 BHK 60.14 8 0 8
0%
2 BHK 62.38 5 0 5
0%
2 BHK 62.48 6 0 6
0%
2 BHK 68.96 1 0 1
0%
2 BHK 69.8 1 0 1
0%
2 BHK LAND OWNER 59.48 6 0 6
0%
2 BHK LAND OWNER 2 60.14 2 0 2
0%
2 BHK LAND OWNER 3 62.38 4 0 4
0%
2 BHK LAND OWNER 4 62.48 3 0 3
0%
2 BHK LAND OWNER 5 65.62 1 0 1
0%
2 BHK LAND OWNER 6 65.72 1 0 1
0%
PREMIUM FLAT 90.63 1 0 1
0%
PREMIUM FLAT 3 138.79 1 0 1
0%
PREMIUM FLAT2 128.22 1 0 1
0%

Construction Progress

ANDREW RESIDENCY, BUILDING NO 1

Basement (if any)100%

Andrew Residency, Building No 1

Excavation100%

ANDREW RESIDENCY, BUILDING NO 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Andrew Residency, Building No 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ANDREW RESIDENCY, BUILDING NO 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%

Andrew Residency, Building No 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

ANDREW RESIDENCY, BUILDING NO 1

Plinth100%
Podiums (if any) 0%

Andrew Residency, Building No 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ANDREW RESIDENCY, BUILDING NO 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%

Andrew Residency, Building No 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ANDREW RESIDENCY, BUILDING NO 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%

Andrew Residency, Building No 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure46%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.