RERA: A51800043517

Kalpataru Heights

by Shivtej Buildcon
Kept in AbeyanceP51700026453
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51700026453
Developer
Shivtej Buildcon
Project Bank
HDFC BANK LTD
Proposed Possession
2024-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
2950.08 sq.m
Total FSI
2950.08
MahaRERA QR
Kalpataru Heights
MahaRERA — P51700026453
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ“…Completion2024-03-31
šŸ“…Completion2024-03-31
šŸš—Open Parking10
šŸ“…Completion2024-03-31

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK16.2727027
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.51505
0%
1RK16.2736036
0%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.4606
0%
1 BHK29.82404
0%
1 BHK30.49101
0%
2 BHK38.71505
0%
2 BHK45.9212012
0%
Office space20.2101
0%
Office space20.7101
0%
Office space28.66101
0%
Office space29.17101
0%
Shop23.76202
0%
Shop32.67202
0%

Construction Progress

A Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

C Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
āœ…Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
⬜Energy management
āœ…Fire Protection And Fire Safety Requirements
āœ…Landscaping & Tree Planting
⬜Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
āœ…Storm Water Drains
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water
⬜Water Conservation, Rain water Harvesting
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.