Kartikya Vatika

by Sunil Chamanlal Gupta Individual
Certificate SignedP52000049066
Kartikya VatikaProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000049066
Registration No.
REA52000128332
Registration Date
2023-01-30
Developer
Sunil Chamanlal Gupta Individual
Architect
ATUL PATEL ARCHITECTS
Project Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession
2029-10-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
161
Units Sold
8 (5%)
Buildings
3
Project Area
5980.00 sq.m
Total FSI
8839.50
Approved FSI
5523.50
MahaRERA QR
Kartikya Vatika
MahaRERA — P52000049066
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units56
🏡Residential56
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units52
🏡Residential52
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units53
🏡Residential51
🏢Non-Residential2

Apartment Configurations

Building No 01

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.62202
0%
1BHK27.78404
0%
1BHK28.07202
0%
1BHK28.3606
0%
1BHK28.32606
0%
1BHK28.4808
0%
1BHK28.43808
0%
1BHK28.45404
0%
1BHK28.48404
0%
1BHK30.29202
0%
1BHK30.31202
0%
1BHK30.72202
0%
1BHK30.75202
0%
1BHK32.63202
0%
1BHK32.65202
0%

Building No 02

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.4808
0%
1BHK28.43808
0%
1BHK28.45606
0%
1BHK28.48606
0%
1BHK28.49202
0%
1BHK28.55220
100%
1BHK28.61404
0%
1BHK28.65202
0%
1BHK28.98202
0%
1BHK29.08202
0%
1BHK29.43211
50%
1BHK30.44202
0%
1BHK30.47202
0%
1BHK30.64202
0%
1BHK31.25101
0%
1BHK31.43101
0%

Building No 03

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.89202
0%
1BHK28.45808
0%
1BHK28.46202
0%
1BHK28.48606
0%
1BHK28.49642
67%
1BHK29.05404
0%
1BHK29.081037
30%
1BHK29.3101
0%
1BHK29.69202
0%
1BHK30.12202
0%
1BHK30.44404
0%
1BHK30.47404
0%
Shop9.05202
0%

Construction Progress

Building No 01

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks7%
Stilt Floor50%

Building No 02

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.68%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks81%
Stilt Floor60%

Building No 03

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.68%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks81%
Stilt Floor60%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
⬜Water conservation /Rain water harvesting