Ksa Elaf

by Shezad Abdul Aziz Reshamwala Individual
Certificate SignedP51900003349
Ksa ElafProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900003349
Registration No.
REA51900007444
Registration Date
2017-08-05
Developer
Shezad Abdul Aziz Reshamwala Individual
Architect
Basharat & Associates
Project Bank
UNION BANK OF INDIA
Proposed Possession
2023-06-30
Revised Possession
2018-12-31
Extended Possession
2023-06-30
Units Sold
0
Buildings
1
Project Area
627.93 sq.m
Total FSI
2915.24
Approved FSI
2915.24
MahaRERA QR
Ksa Elaf
MahaRERA — P51900003349
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
✅Sanctioned19

Apartment Configurations

KSA ELAF

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.95880
100%
1BHK39.4770
100%
1BHK39.62220
100%
1BHK39.77110
100%
2BHK48.2220
100%
2BHK52.82110
100%

Construction Progress

KSA ELAF

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
⬜Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
⬜Water Supply
✅Water conservation /Rain water harvesting100%