📞 +91 98200 30685✉️
RERA: A51800043517

Kumkum Darshan

by Kalash Devcon Llp
Kept in AbeyanceP99000011976

Project Information

RERA Certificate No.
P99000011976
Registration No.
REA99000010998
Developer
Kalash Devcon Llp
Project Bank
RBL BANK LTD
Proposed Possession
2018-03-01
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Buildings
2
Project Area
4870.29 sq.m
Total FSI
9994.14
Litigations
⚠️ Yes
MahaRERA QR
Kumkum Darshan
MahaRERA — P99000011976
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking16
🅿️Closed Parking1
📅Completion2020-12-30
🚗Open Parking11
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

Kumkum Darshan Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK31.61385
62%
1 BHK33.4624123
4%
1 BHK33.9213112
85%
1 BHK35.321192
82%
2 BHK50.19101
0%
2 BHK51.12261214
46%
2 BHK51.5813211
15%

Kumkum Darshan Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.4613013
0%
1 BHK34.3911011
0%
1 BHK35.7826026
0%
2 BHK51.5826323
12%

Construction Progress

Kumkum Darshan Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate5%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Kumkum Darshan Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate2%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.78%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station10%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking30%
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now