Lijjat Ganga

by Jay Associates
Certificate SignedP51800008570
Lijjat GangaProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800008570
Registration No.
REA51800010416
Developer
Jay Associates
Architect
S Architect
Project Bank
Bank of India
Proposed Possession
2026-12-31
Revised Possession
2019-05-31
Extended Possession
2025-06-30
Total Units
70
Units Sold
29 (41%)
Buildings
4
Project Area
1886.50 sq.m
Total FSI
5093.00
Approved FSI
773.00
MahaRERA QR
Lijjat Ganga
MahaRERA — P51800008570
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable5
🔢Total Units15
🏡Residential15
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable5
🔢Total Units15
🏡Residential15
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable8
🔢Total Units24
🏡Residential24
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable8
🔢Total Units16
🏡Residential16

Apartment Configurations

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK49.251019
10%
2BHK56.0514
20%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK42.68550
100%
2BHK49.25532
60%
2BHK56.0505
0%

Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK49.251679
44%
2BHK56.0853
62%

Wing D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK56.0817
12%
3BHK78.06862
75%

Construction Progress

Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

Wing D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station40%
⬜Energy managemcnt
✅Fire protection and fire safety requirements10%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting70%
✅Open Parking10%
✅Sewerage (Chamber, Lines, Septic Tank , STP)20%
✅Solid Waste Management And Disposal5%
✅Storm Water Drains40%
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water10%
✅Water Supply10%
✅Water conservation /Rain water harvesting10%